| Task Category | Task Identity | Task Description | Operator |
| Breakout Tanks | 006 | Inspection of Breakout Tanks | CCT |
| Breakout Tanks | SCE085 | Protect Breakout Tanks From Static Electricity Lightning and Stray Electrical Currents | SCE |
| Breakout Tanks | SCE085OP | Protect Breakout Tanks From Static Electricity Lightning and Stray Electrical Currents | CCT |
| Breakout Tanks | SCE087 | Inspect and Repair of Breakout Tanks | SCE |
| Breakout Tanks | SCE087OP | Inspect and Repair of Breakout Tanks | CCT |
| Breakout Tanks | 010 | Routine Visual Inspection of Breakout Tanks | CCT |
| Breakout Tanks | CM 010OP | Routine Visual Inspection of Breakout Tanks | CCT |
| Breakout Tanks | PAA-22.0 | Inspect Tank Pressure/Vacuum Breakers and Inspect, Test, and Calibrate HVL Tank Pressure Relief Valves | CCT |
| Breakout Tanks | VM-010OP | Routine Visual Inspection of Breakout Tanks | CCT |
| Breakout Tanks | TC-050 | Breakout Tanks Vacuum Box Testing of Welds | TC |
| Casing: Clearing Shorted Casing | 410 | Clear Shorted Casing | CCT |
| Casing: Clearing Shorted Casing | SCE016 | Clear Shorted Casings | SCE |
| Casing: Clearing Shorted Casing | SCE016OP | Clear Shorted Casings | CCT |
| Casing: Clearing Shorted Casing | SCE017 | Monitor Shorted Casings | SCE |
| Casing: Clearing Shorted Casing | SCE017OP | Monitor Shorted Casings | CCT |
| Casing: Clearing Shorted Casing | FCG 007G OP | Inspecting for a Shorted Casing | CCT |
| Casing: Clearing Shorted Casing | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Casing: Clearing Shorted Casing | FCG 007G | Inspecting for a Shorted Casing | FCG |
| Casing: Clearing Shorted Casing | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Casing: Vents and Seals | OQ-0971 | Task 0971 Installation and Maintenance of Casing Spacers, Vents and Seals | DOM |
| Casing: Vents and Seals | OQ-0971 | Task 0971 Installation and Maintenance of Casing Spacers, Vents and Seals | DOMHOPE |
| Casing: Vents and Seals | OKE 741 | Installation and Maintenance of Casing Spacers, Vents and Seals (G0971) | ONEOK |
| Casing: Vents and Seals | 741 | Installation and Maintenance of Casing Spacers, Vents and Seals | CCT |
| Cast Iron: Operations/Maintenance | OQ-1111 | Task 1111 Tapping Cast and Ductile Iron Pipe, and Low Pressure Steel Pipe | DOM |
| Cast Iron: Operations/Maintenance | OQ-1111 | Task 1111 Tapping Cast and Ductile Iron Pipe, and Low Pressure Steel Pipe | DOMHOPE |
| Cast Iron: Operations/Maintenance | 780 | Cast Iron - Caulked Bell and Spigot Joints - Installation and Maintenance of Mechanical Leak Clamp(s) | CCT |
| Cast Iron: Operations/Maintenance | 781 | Cast Iron Joints - Sealing: Encapsulation | CCT |
| Cast Iron: Operations/Maintenance | 782 | Internal Sealing - Cast Iron and Ductile Iron | CCT |
| Cast Iron: Operations/Maintenance | OQ-0831 | OQ-0831 Cast Iron - Caulked Bell and Spigot Joints - Installation and Maintenance of Mechanical Leak Clamp(s) | DOM |
| Cast Iron: Operations/Maintenance | OQ-0836 | OQ-0836 Cast Iron - Bell and Spigot Joints - Repair with Epoxy Sealant | DOM |
| Cast Iron: Operations/Maintenance | FCG 001SUBC OP | Pipeline Shutdown, Cast Iron | CCT |
| Cast Iron: Operations/Maintenance | FCG 038A OP | O&M of cast iron pipe | CCT |
| Cast Iron: Operations/Maintenance | FCG 051E OP | Tapping Cast Iron Pipe | CCT |
| Cast Iron: Operations/Maintenance | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Cast Iron: Operations/Maintenance | FCG 001SUBC | Pipeline Shutdown, Cast Iron | FCG |
| Cast Iron: Operations/Maintenance | FCG 038A | O&M of cast iron pipe | FCG |
| Cast Iron: Operations/Maintenance | FCG 051E | Tapping Cast Iron Pipe | FCG |
| Cast Iron: Operations/Maintenance | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Cathodic Protection: Determine Requirements | 406 | Conduct Test to Determine Cathodic Protection Current Requirements | CCT |
| Cathodic Protection: Determine Requirements | 420 | Soil Resistivity | CCT |
| Cathodic Protection: Determine Requirements | OQ-0021 | Task 0021 Measure Soil Resistivity | DOM |
| Cathodic Protection: Determine Requirements | OQ-0021 | Task 0021 Measure Soil Resistivity | DOMHOPE |
| Cathodic Protection: Determine Requirements | 430 | Installation and Testing of Mechanical Electrical Connections | CCT |
| Cathodic Protection: Inspection/Monitoring | 407 | Perform Cathodic Protection Survey | CCT |
| Cathodic Protection: Inspection/Monitoring | 409 | Inspect Interference Bonds | CCT |
| Cathodic Protection: Inspection/Monitoring | 411 | Inspect/Test to Assure Electrical Isolation is Adequate | CCT |
| Cathodic Protection: Inspection/Monitoring | 419 | Cathodic Protection Potential Measurement | CCT |
| Cathodic Protection: Inspection/Monitoring | OQ-0001 | Task 0001 Measure Structure-to-Electrolyte Potential | DOM |
| Cathodic Protection: Inspection/Monitoring | OQ-0001 | Task 0001 Measure Structure-to-Electrolyte Potential | DOMHOPE |
| Cathodic Protection: Inspection/Monitoring | OQ-0011 | Task 0011 Conduct Close Interval Survey | DOM |
| Cathodic Protection: Inspection/Monitoring | OQ-0011 | Task 0011 Conduct Close Interval Survey | DOMHOPE |
| Cathodic Protection: Inspection/Monitoring | OQ-0061 | Task 0061 Inspect or Test Cathodic Protection Bonds | DOM |
| Cathodic Protection: Inspection/Monitoring | OQ-0061 | Task 0061 Inspect or Test Cathodic Protection Bonds | DOMHOPE |
| Cathodic Protection: Inspection/Monitoring | OQ-0071 | Task 0071 Inspect or Test Cathodic Protection Electrical Isolation Devices | DOM |
| Cathodic Protection: Inspection/Monitoring | OQ-0071 | Task 0071 Inspect or Test Cathodic Protection Electrical Isolation Devices | DOMHOPE |
| Cathodic Protection: Inspection/Monitoring | OQ-0091 | Task 0091 Troubleshoot In-Service Cathodic Protection System | DOM |
| Cathodic Protection: Inspection/Monitoring | OQ-0091 | Task 0091 Troubleshoot In-Service Cathodic Protection System | DOMHOPE |
| Cathodic Protection: Inspection/Monitoring | SCE001 | Perform Cathodic Protection Annual Survey | SCE |
| Cathodic Protection: Inspection/Monitoring | SCE001OP | Perform Cathodic Protection Annual Survey | CCT |
| Cathodic Protection: Inspection/Monitoring | SCE002 | Take Pipe to Soil Readings | SCE |
| Cathodic Protection: Inspection/Monitoring | SCE002OP | Take Pipe to Soil Readings | CCT |
| Cathodic Protection: Inspection/Monitoring | SCE003 | Investigate/Correct Interference Problems | SCE |
| Cathodic Protection: Inspection/Monitoring | SCE003OP | Investigate/Correct Interference Problems | CCT |
| Cathodic Protection: Inspection/Monitoring | SCE004 | Maintain Automatic Potential Control Systems | SCE |
| Cathodic Protection: Inspection/Monitoring | SCE004OP | Maintain Automatic Potential Control Systems | CCT |
| Cathodic Protection: Inspection/Monitoring | SCE009 | Perform Close Interval Survey/Electrical Survey | SCE |
| Cathodic Protection: Inspection/Monitoring | SCE009OP | Perform Close Interval Survey/Electrical Survey | CCT |
| Cathodic Protection: Inspection/Monitoring | SCE013 | Monitor Bonds | SCE |
| Cathodic Protection: Inspection/Monitoring | SCE013OP | Monitor Bonds | CCT |
| Cathodic Protection: Inspection/Monitoring | SCE014 | Test Electrical Isolation on Flanges/Connections | SCE |
| Cathodic Protection: Inspection/Monitoring | SCE014OP | Test Electrical Isolation on Flanges/Connections | CCT |
| Cathodic Protection: Inspection/Monitoring | SCE015 | Check Electrical Isolation on Casings/Boxes | SCE |
| Cathodic Protection: Inspection/Monitoring | SCE015OP | Check Electrical Isolation on Casings/Boxes | CCT |
| Cathodic Protection: Inspection/Monitoring | SCE022 | Perform Offshore Pipeline Cathodic Protection Annual Survey | SCE |
| Cathodic Protection: Inspection/Monitoring | SCE022OP | Perform Offshore Pipeline Cathodic Protection Annual Survey | CCT |
| Cathodic Protection: Inspection/Monitoring | SCE025 | Inspect Foreign Line Crossing | SCE |
| Cathodic Protection: Inspection/Monitoring | SCE025OP | Inspect Foreign Line Crossing | CCT |
| Cathodic Protection: Inspection/Monitoring | BWP9029 | Inspect Interference Bonds | BWP |
| Cathodic Protection: Inspection/Monitoring | 9029 | Inspect Interference Bonds | CCT |
| Cathodic Protection: Inspection/Monitoring | BWP9030 | Cathodic Protection Potential Measurement | BWP |
| Cathodic Protection: Inspection/Monitoring | 9030 | Cathodic Protection Potential Measurement | CCT |
| Cathodic Protection: Inspection/Monitoring | LBGO 409OP | Inspect Interference Bonds | CCT |
| Cathodic Protection: Inspection/Monitoring | LBGO 411OP | Inspect/Test to Assure Electrical Isolation is Adequate | CCT |
| Cathodic Protection: Inspection/Monitoring | LBGO 419OP | Cathodic Protection Potential Measurement | CCT |
| Cathodic Protection: Inspection/Monitoring | CM 407OP | Perform Cathodic Protection Survey | CCT |
| Cathodic Protection: Inspection/Monitoring | OKE 432 | Troubleshoot In-Service Cathodic Protection System (G0091) | ONEOK |
| Cathodic Protection: Inspection/Monitoring | LBGO 419 | Cathodic Protection Potential Measurement | LBGO |
| Cathodic Protection: Inspection/Monitoring | 432 | Troubleshoot In-Service Cathodic Protection System | CCT |
| Cathodic Protection: Inspection/Monitoring | FCG 003A OP | Cathodic Protection Testing (Pipe-To-Soil) | CCT |
| Cathodic Protection: Inspection/Monitoring | FCG 003B OP | Cathodic Protection Testing (Pipe-To-Soil)-Survey Contractors | CCT |
| Cathodic Protection: Inspection/Monitoring | FCG 007A OP | ECC: Operation of Short Locator, Tinker and Rasor Pipe Detector (PD) | CCT |
| Cathodic Protection: Inspection/Monitoring | FCG 007B OP | ECC: Operation of Short Locator, Radiodetection Pipeline Current Mapper (PCM) | CCT |
| Cathodic Protection: Inspection/Monitoring | FCG 007D OP | Conducting Interference Testing | CCT |
| Cathodic Protection: Inspection/Monitoring | FCG 007F OP | Electrical Isolation Testing | CCT |
| Cathodic Protection: Inspection/Monitoring | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Cathodic Protection: Inspection/Monitoring | FCG 003A | Cathodic Protection Testing (Pipe-To-Soil) | FCG |
| Cathodic Protection: Inspection/Monitoring | FCG 003B | Cathodic Protection Testing (Pipe-To-Soil)-Survey Contractors | FCG |
| Cathodic Protection: Inspection/Monitoring | FCG 007A | ECC: Operation of Short Locator, Tinker and Rasor Pipe Detector (PD) | FCG |
| Cathodic Protection: Inspection/Monitoring | FCG 007B | ECC: Operation of Short Locator, Radiodetection Pipeline Current Mapper (PCM) | FCG |
| Cathodic Protection: Inspection/Monitoring | FCG 007D | Conducting Interference Testing | FCG |
| Cathodic Protection: Inspection/Monitoring | FCG 007F | Electrical Isolation Testing | FCG |
| Cathodic Protection: Inspection/Monitoring | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Cathodic Protection: Installation | OQ-0081 | Task 0081 Install Cathodic Protection Electrical Isolation Devices | DOM |
| Cathodic Protection: Installation | OQ-0081 | Task 0081 Install Cathodic Protection Electrical Isolation Devices | DOMHOPE |
| Cathodic Protection: Installation | 908 | Installation of Cathodic Protection | CCT |
| Cathodic Protection: Installation | OPNSA-i908 | Installation of Cathodic Protection | OPNA |
| Cathodic Protection: Installation | OPNSA-i908OP | Installation of Cathodic Protection | CCT |
| Cathodic Protection: Installation | LBGO 908OP | Installation of Cathodic Protection | CCT |
| Cathodic Protection: Installation | BHP - 431 | Install Cathodic Protection Electrical Isolation Devices | CCT |
| Cathodic Protection: Installation | OKE 431 | Install Cathodic Protection Electrical Isolation Devices (G0081) | ONEOK |
| Cathodic Protection: Installation | 431 | Install Cathodic Protection Electrical Isolation Devices | CCT |
| Cathodic Protection: Installation (AC Mitigation) | 907 | Induced AC Detection and Monitoring | CCT |
| Cathodic Protection: Installation (AC Mitigation) | FCG 009B OP | Installation of Zinc Ribbon for AC Mitigation | CCT |
| Cathodic Protection: Installation (AC Mitigation) | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Cathodic Protection: Installation (AC Mitigation) | FCG 009B | Installation of Zinc Ribbon for AC Mitigation | FCG |
| Cathodic Protection: Installation (AC Mitigation) | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Cathodic Protection: Installation (Submerged) | 413 | Anode Installation on Submerged Pipeline or Facilities | CCT |
| Cathodic Protection: Installation (Submerged) | SCE023 | Install and Maintain Anodes On Offshore Piping and Facilities | SCE |
| Cathodic Protection: Installation (Submerged) | SCE023OP | Install and Maintain Anodes On Offshore Piping and Facilities | CCT |
| Cathodic Protection: Installation of CP Leads | 412 | Install CP Leads on Pipeline Using Exothermic Weld | CCT |
| Cathodic Protection: Installation of CP Leads | OQ-0041 | Task 0041 Installation and Maintenance of Mechanical Electrical Connections | DOM |
| Cathodic Protection: Installation of CP Leads | OQ-0041 | Task 0041 Installation and Maintenance of Mechanical Electrical Connections | DOMHOPE |
| Cathodic Protection: Installation of CP Leads | OQ-0051 | Task 0051 Installation of Exothermic Electrical Connections | DOM |
| Cathodic Protection: Installation of CP Leads | OQ-0051 | Task 0051 Installation of Exothermic Electrical Connections | DOMHOPE |
| Cathodic Protection: Installation of CP Leads | SCE018 | Install and Maintain Test Leads and Test Stations | SCE |
| Cathodic Protection: Installation of CP Leads | SCE018OP | Install and Maintain Test Leads and Test Stations | CCT |
| Cathodic Protection: Installation of CP Leads | 428 | Pin Brazing to Install CP Leads on Pipeline | CCT |
| Cathodic Protection: Installation of CP Leads | TC-412-I | Install CP Leads on Pipeline Using Exothermic Weld (Inspection Only) | TC |
| Cathodic Protection: Installation of CP Leads | CHK-412i | Install CP Leads on Pipeline Using Exothermic Weld (Inspection only) | CEC |
| Cathodic Protection: Installation of CP Leads | AGL-008H | Handy Cap IP Patch | AGL |
| Cathodic Protection: Installation of CP Leads | MW-412i | Install CP Leads on Pipeline Using Exothermic Weld (Inspection only) | MWE |
| Cathodic Protection: Installation of CP Leads | OPNSA-i412 | Install CP Leads on Pipeline Using Exothermic Weld (Inspection only) | OPNA |
| Cathodic Protection: Installation of CP Leads | OPNSA-i412OP | Install CP Leads on Pipeline Using Exothermic Weld (Inspection only) | CCT |
| Cathodic Protection: Installation of CP Leads | LBGO 428OP | Pin Brazing to Install CP Leads on Pipeline | CCT |
| Cathodic Protection: Installation of CP Leads | LBGO 430OP | Installation and Testing of Mechanical Electrical Connections | CCT |
| Cathodic Protection: Installation of CP Leads | OPNSA-i428 | Pin Brazing to Install CP Leads on Pipeline (Inspector Only) | OPNA |
| Cathodic Protection: Installation of CP Leads | FCG 009A OP | ECC: Corrosion control - installing test leads | CCT |
| Cathodic Protection: Installation of CP Leads | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Cathodic Protection: Installation of CP Leads | FCG 009A | ECC: Corrosion control - installing test leads | FCG |
| Cathodic Protection: Installation of CP Leads | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Cathodic Protection: Rectifier and/or Ground Bed Inspection/Operation/Maintenance | 408 | Inspect Cathodic Protection Rectifier | CCT |
| Cathodic Protection: Rectifier and/or Ground Bed Inspection/Operation/Maintenance | OQ-0031 | Task 0031 Inspect and Monitor Galvanic Ground Beds/Anodes | DOM |
| Cathodic Protection: Rectifier and/or Ground Bed Inspection/Operation/Maintenance | OQ-0031 | Task 0031 Inspect and Monitor Galvanic Ground Beds/Anodes | DOMHOPE |
| Cathodic Protection: Rectifier and/or Ground Bed Inspection/Operation/Maintenance | OQ-0101 | Task 0101 Inspect Rectifier and Obtain Readings | DOM |
| Cathodic Protection: Rectifier and/or Ground Bed Inspection/Operation/Maintenance | OQ-0101 | Task 0101 Inspect Rectifier and Obtain Readings | DOMHOPE |
| Cathodic Protection: Rectifier and/or Ground Bed Inspection/Operation/Maintenance | OQ-0111 | Task 0111 Maintain Rectifier | DOM |
| Cathodic Protection: Rectifier and/or Ground Bed Inspection/Operation/Maintenance | OQ-0111 | Task 0111 Maintain Rectifier | DOMHOPE |
| Cathodic Protection: Rectifier and/or Ground Bed Inspection/Operation/Maintenance | SCE011 | Monitor Rectifiers | SCE |
| Cathodic Protection: Rectifier and/or Ground Bed Inspection/Operation/Maintenance | SCE011OP | Monitor Rectifiers | CCT |
| Cathodic Protection: Rectifier and/or Ground Bed Inspection/Operation/Maintenance | SCE012 | Troubleshoot/Repair Cathodic Rectifiers and Ground Beds | SCE |
| Cathodic Protection: Rectifier and/or Ground Bed Inspection/Operation/Maintenance | SCE012OP | Troubleshoot/Repair Cathodic Rectifiers and Ground Beds | CCT |
| Cathodic Protection: Rectifier and/or Ground Bed Inspection/Operation/Maintenance | BWP9028 | Inspect Cathodic Protection Rectifier | BWP |
| Cathodic Protection: Rectifier and/or Ground Bed Inspection/Operation/Maintenance | 9028 | Inspect Cathodic Protection Rectifier | CCT |
| Cathodic Protection: Rectifier and/or Ground Bed Inspection/Operation/Maintenance | LBGO 408OP | Inspect Cathodic Protection Rectifier | CCT |
| Cathodic Protection: Rectifier and/or Ground Bed Inspection/Operation/Maintenance | VM-408OP | Inspect Cathodic Protection Rectifier | CCT |
| Cathodic Protection: Rectifier and/or Ground Bed Inspection/Operation/Maintenance | FCG 007E OP | Rectifier Inspection and Operation | CCT |
| Cathodic Protection: Rectifier and/or Ground Bed Inspection/Operation/Maintenance | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Cathodic Protection: Rectifier and/or Ground Bed Inspection/Operation/Maintenance | FCG 007E | Rectifier Inspection and Operation | FCG |
| Cathodic Protection: Rectifier and/or Ground Bed Inspection/Operation/Maintenance | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Cathodic Protection: Rectifier and/or Ground Bed Inspection/Operation/Maintenance | CC-126OP | Obtain a Voltage and Current Output Reading | CCT |
| Cathodic Protection: Rectifier and/or Ground Bed Inspection/Operation/Maintenance | CC-127OP | Check for Proper Operation of Rectifier | CCT |
| Cathodic Protection: Rectifier and/or Ground Bed Inspection/Operation/Maintenance | 465 | Inspect and Maintain Cathodic Protection Rectifier | CCT |
| Coating : Application and Inspection | 427 | Inspection of Coating Application | CCT |
| Coating : Application and Inspection | OQ-1011 | Task 1011 Coating Application and Repair - Wrapped | DOM |
| Coating : Application and Inspection | OQ-1011 | Task 1011 Coating Application and Repair - Wrapped | DOMHOPE |
| Coating : Application and Inspection | OQ-0991 | Task 0991 Coating Application and Repair - Brushed or Rolled | DOM |
| Coating : Application and Inspection | OQ-0991 | Task 0991 Coating Application and Repair - Brushed or Rolled | DOMHOPE |
| Coating : Application and Inspection | OQ-1001 | Task 1001 Coating Application and Repair - Sprayed | DOM |
| Coating : Application and Inspection | OQ-1001 | Task 1001 Coating Application and Repair - Sprayed | DOMHOPE |
| Coating : Application and Inspection | SCE005 | Inspect Coating Applications | SCE |
| Coating : Application and Inspection | SCE005OP | Inspect Coating Applications | CCT |
| Coating : Application and Inspection | SCE008 | Apply and Repair Coating | SCE |
| Coating : Application and Inspection | SCE008OP | Apply and Repair Coating | CCT |
| Coating : Application and Inspection | ET-427-I | Inspection of the Application of Above or Below Ground Coatings | ETC |
| Coating : Application and Inspection | TC-427-I | Inspection of the Application of Above or Below Ground Coatings (Inspection Only) | TC |
| Coating : Application and Inspection | CHK-402i | Apply Approved Coatings to Above Ground Piping (Inspection only) | CEC |
| Coating : Application and Inspection | CHK-403i | Apply Approved Coatings to Below Ground Piping (Inspection only) | CEC |
| Coating : Application and Inspection | AGL-008I | Syntho Sleeve Application | AGL |
| Coating : Application and Inspection | AGL-008J | Coating Pipe (Shrink sleeve) Application | AGL |
| Coating : Application and Inspection | 480 | Apply Approved Coating by Hand Application | CCT |
| Coating : Application and Inspection | 482 | Apply Approved Coatings by Mechanical Spray and Hand Application Methods | CCT |
| Coating : Application and Inspection | 484 | Apply Approved Coatings by Wrap Application | CCT |
| Coating : Application and Inspection | 9027 | Apply Approved Coatings to Above Ground Piping | CCT |
| Coating : Application and Inspection | BHP - i427 | Inspection of the Application of Above or Below Ground Coatings | BHPFPU |
| Coating : Application and Inspection | AGL-008K | Moisture Cured Outerwrap Application | AGL |
| Coating : Application and Inspection | LBGO 480OP | Apply Approved Coating by Hand Application | CCT |
| Coating : Application and Inspection | LBGO 484OP | Apply Approved Coatings by Wrap Application | CCT |
| Coating : Application and Inspection | LBGO 480 | Apply Approved Coating by Hand Application | LBGO |
| Coating : Application and Inspection | LBGO 482 | Apply Approved Coatings by Mechanical Spray and Hand Application Methods | LBGO |
| Coating : Application and Inspection | LBGO 484 | Apply Approved Coatings by Wrap Application | LBGO |
| Coating : Application and Inspection | MW-427i | Inspection of Above or Below Ground Coatings | MWE |
| Coating : Application and Inspection | LBGO 485 | Apply Approved MCO Outerwrap | LBGO |
| Coating : Application and Inspection | LBGO 485OP | Apply Approved MCO Outerwrap | CCT |
| Coating : Application and Inspection | VM-427OP | Inspection of Above or Below Ground Coatings | CCT |
| Coating : Application and Inspection | FCG 008A OP | ECC: Corrosion control - inspection and application of coating | CCT |
| Coating : Application and Inspection | FCG 008B OP | inspection and application of coating Epoxy Coating | CCT |
| Coating : Application and Inspection | FCG 008D OP | Inspection of Coating by Jeeping | CCT |
| Coating : Application and Inspection | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Coating : Application and Inspection | FCG 008A | ECC: Corrosion control - inspection and application of coating | FCG |
| Coating : Application and Inspection | FCG 008B | inspection and application of coating Epoxy Coating | FCG |
| Coating : Application and Inspection | FCG 008D | Inspection of Coating by Jeeping | FCG |
| Coating : Application and Inspection | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Coating : Application and Inspection | SCSD 2.19 | Inspection of Coating Application | SOCAL |
| Coating : Inspection (Holiday Detection) | 426 | Inspect Pipe Coating with Holiday Detector | CCT |
| Coating : Inspection (Holiday Detection) | TC-426-I | Monitoring Pipe Coating Holiday Detection | TC |
| Coating : Inspection (Holiday Detection) | MW-426i | Inspect Pipe Coating with Holiday Detector (Inspection only) | MWE |
| Coating : Inspection (Holiday Detection) | CM 426OP | Inspect Pipe Coating with Holiday Detector | CCT |
| Coating : Inspection (Holiday Detection) | OPNSA-i426 | Inspect Pipe Coating with Holiday Detector | OPNA |
| Coating Protection: Above Ground Structures | 405 | Protection of Coatings From Above Ground Structures | CCT |
| Coating Protection: Above Ground Structures | OQ-0961 | Task 0961 Above Ground Supports and Anchors - Inspection, Preventive and Corrective Maintenance | DOM |
| Coating Protection: Above Ground Structures | OQ-0961 | Task 0961 Above Ground Supports and Anchors - Inspection, Preventive and Corrective Maintenance | DOMHOPE |
| Coating Protection: Above Ground Structures | TC-405-I | Protection of Coatings From Above Ground Structures (Inspection only) | TC |
| Coating Protection: Above Ground Structures | MW-405i | Protection of Coatings From Above Ground Structures (Inspection only) | MWE |
| Coating Protection: Above Ground Structures | DCG 740OP | Above Ground Supports and Anchors: Inspection, Prevention, and Corrective Maintenance | CCT |
| Coating Protection: Above Ground Structures | BHP - 740 | Above Ground Supports and Anchors: Inspection, Prevention, and Corrective Maintenance | CCT |
| Coating Protection: Above Ground Structures | OKE 740 | Above Ground Supports and Anchors: Inspection, Prevention, and Corrective Maintenance (G0961) | ONEOK |
| Coating Protection: Above Ground Structures | 740 | Above Ground Supports and Anchors: Inspection, Preventive and Corrective Maintenance | CCT |
| Coating Protection: Above Ground Structures | VM-740OP | Above Ground Supports and Anchors: Inspection, Preventive and Corrective Maintenance | CCT |
| Coating Protection: Backfilling | 404 | Protection of Coating When Backfilling and From Below Ground Supports | CCT |
| Coating Protection: Backfilling | OQ-0981 | Task 0981 Backfilling | DOM |
| Coating Protection: Backfilling | OQ-0981 | Task 0981 Backfilling | DOMHOPE |
| Coating Protection: Backfilling | TC-404-I | Protection of Coating When Backfilling and From Below Ground Supports (Inspection only) | TC |
| Coating Protection: Backfilling | MW-404i | Protection of Coating When Backfilling and From Below Ground Supports (Inspection only) | MWE |
| Coating Protection: Backfilling | LBGO 404OP | Protection of Coating When Backfilling and From Below Ground Supports or Other Substructures | CCT |
| Coating Protection: Backfilling | LBGO 404 | Protection of Coating When Backfilling and From Below Ground Supports or Other Substructures | LBGO |
| Coating Protection: Backfilling | VM-404OP | Protection of Coating When Backfilling and From Below Ground Supports | CCT |
| Compression Couplings - Mechanical Joining | OQ-0681 | Task 0681 Joining of Plastic Pipe - Stab Fittings | DOM |
| Compression Couplings - Mechanical Joining | OQ-0681 | Task 0681 Joining of Plastic Pipe - Stab Fittings | DOMHOPE |
| Compression Couplings - Mechanical Joining | OQ-0691 | Task 0691 Joining of Pipe - Non-Bottom Out Compression Couplings | DOM |
| Compression Couplings - Mechanical Joining | OQ-0691 | Task 0691 Joining of Pipe - Non-Bottom Out Compression Couplings | DOMHOPE |
| Compression Couplings - Mechanical Joining | OQ-0701 | Task 0701 Joining of Pipe - Bottom Out Compression Couplings | DOM |
| Compression Couplings - Mechanical Joining | OQ-0701 | Task 0701 Joining of Pipe - Bottom Out Compression Couplings | DOMHOPE |
| Compression Couplings - Mechanical Joining | OQ-0711 | Task 0711 Joining of Pipe - Compression Couplings | DOM |
| Compression Couplings - Mechanical Joining | OQ-0711 | Task 0711 Joining of Pipe - Compression Couplings | DOMHOPE |
| Compression Couplings - Mechanical Joining | OKE 220 | Joining of Pipe - Non-Bottom-Out Compression Couplings (G0691) | ONEOK |
| Compression Couplings - Mechanical Joining | OKE 221 | Joining of Pipe - Bottom-Out Compression Couplings (G0701) | ONEOK |
| Compression Couplings - Mechanical Joining | 220 | Joining of Pipe - Non-Bottom-Out Compression Couplings | CCT |
| Compression Couplings - Mechanical Joining | 221 | Joining of Pipe - Bottom-Out Compression Couplings | CCT |
| Compression Couplings - Mechanical Joining | FCG-JQ-MECH-BOLT OP | Mechanical Joining Bolt Type Compression Coupling | CCT |
| Compression Couplings - Mechanical Joining | FCG-JQ-MECH-NUT-BTM OP | Mechanical Joining Nut Type Bottom-Out Fitting | CCT |
| Compression Couplings - Mechanical Joining | FCG-JQ-MECH-NUT-NON-BTM OP | Mechanical Joining Nut Type Non Bottom-Out Fitting | CCT |
| Compression Couplings - Mechanical Joining | FCG-JQ-MECH-STAB OP | Mechanical Joining Stab Type Fitting | CCT |
| Compression Couplings - Mechanical Joining | FCG-JQ-MECH-BOLT | Mechanical Joining Bolt Type Compression Coupling | FCG |
| Compression Couplings - Mechanical Joining | FCG-JQ-MECH-NUT-BTM | Mechanical Joining Nut Type Bottom-Out Fitting | FCG |
| Compression Couplings - Mechanical Joining | FCG-JQ-MECH-NUT-NON-BTM | Mechanical Joining Nut Type Non Bottom-Out Fitting | FCG |
| Compression Couplings - Mechanical Joining | FCG-JQ-MECH-STAB | Mechanical Joining Stab Type Fitting | FCG |
| Compressor / Pump Stations: Inspect/Test Remote Control Shutdown Devices (ESD/EBD) | 710 | Inspect/Test Compressor Station Remote Control Shutdown Devices (ESD/EBD) | CCT |
| Compressor / Pump Stations: Inspect/Test Remote Control Shutdown Devices (ESD/EBD) | SCE070 | Test/Troubleshoot/Repair Unit and Emergency Shutdown Devices | SCE |
| Compressor / Pump Stations: Inspect/Test Remote Control Shutdown Devices (ESD/EBD) | SCE070OP | Test/Troubleshoot/Repair Unit and Emergency Shutdown Devices | CCT |
| Compressor / Pump Stations: Inspect/Test Remote Control Shutdown Devices (ESD/EBD) | SCE099 | Initiate ESD Signal to a Remote Facility or Compressor Station | SCE |
| Compressor / Pump Stations: Inspect/Test Remote Control Shutdown Devices (ESD/EBD) | SCE099OP | Initiate ESD Signal to a Remote Facility or Compressor Station | CCT |
| Compressor / Pump Stations: Inspect/Test Remote Control Shutdown Devices (ESD/EBD) | 026 | Inspect/Test Pump Station Remote Control Shutdown Devices | CCT |
| Compressor / Pump Stations: Inspect/Test Remote Control Shutdown Devices (ESD/EBD) | VM-026OP | Inspect/Test Pump Station Remote Control Shutdown Devices | CCT |
| Compressor Units / Stations: Preventive/Corrective Maintenance | B31OQ-0461-001 | Compressor Panelboard Repair | ONEOK |
| Compressor Units / Stations: Preventive/Corrective Maintenance | SPC-001 | Compressor Preventive Maintenance | SPC |
| Compressor Units / Stations: Preventive/Corrective Maintenance | SPC-002 | Compressor Inspection, Testing and Corrective Maintenance | SPC |
| Compressor Units / Stations: Preventive/Corrective Maintenance | SPC-003 | Compressor Panel Board Repair | SPC |
| Compressor Units / Stations: Preventive/Corrective Maintenance | DCG 750OP | Compressor Preventive Maintenance | CCT |
| Compressor Units / Stations: Preventive/Corrective Maintenance | 750 | Compressor Preventive Maintenance | CCT |
| Compressor Units / Stations: Preventive/Corrective Maintenance | OKE 753 | Rotary Compressor Preventive Maintenance (G0491) | ONEOK |
| Compressor Units / Stations: Preventive/Corrective Maintenance | 751 | Reciprocating Compressor Preventive Maintenance | CCT |
| Compressor Units / Stations: Preventive/Corrective Maintenance | 752 | Centrifugal Compressor Preventive Maintenance | CCT |
| Compressor Units / Stations: Preventive/Corrective Maintenance | 753 | Rotary Compressor Preventive Maintenance | CCT |
| Compressor Units / Stations: Start-up, Operation, and Shutdown | 603 | Compressor Units: Startup, Operation, Shutdown and Purging Before Returning to Service | CCT |
| Compressor Units / Stations: Start-up, Operation, and Shutdown | SCE065 | Read/Verify/Maintain Operating Parameters on Drivers and Compressors | SCE |
| Compressor Units / Stations: Start-up, Operation, and Shutdown | SCE065OP | Read/Verify/Maintain Operating Parameters on Drivers and Compressors | CCT |
| Compressor Units / Stations: Start-up, Operation, and Shutdown | SCE066 | Start/Stop/Load Drivers and Compressors | SCE |
| Compressor Units / Stations: Start-up, Operation, and Shutdown | SCE066OP | Start/Stop/Load Drivers and Compressors | CCT |
| Compressor Units / Stations: Start-up, Operation, and Shutdown | SCE072 | Startup/Shutdown/Operate Station | SCE |
| Compressor Units / Stations: Start-up, Operation, and Shutdown | SCE072OP | Startup/Shutdown/Operate Station | CCT |
| Compressor Units / Stations: Start-up, Operation, and Shutdown | SCE098 | Start & Stop Engines | SCE |
| Compressor Units / Stations: Start-up, Operation, and Shutdown | SCE098OP | Start & Stop Engines | CCT |
| Compressor Units / Stations: Start-up, Operation, and Shutdown | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Compressor Units / Stations: Start-up, Operation, and Shutdown | FCG 060A OP | Start Up and Shutdown of Compressor Station | CCT |
| Compressor Units / Stations: Start-up, Operation, and Shutdown | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Compressor Units / Stations: Start-up, Operation, and Shutdown | FCG 060A | Start Up and Shutdown of Compressor Station | FCG |
| Compressor Units / Stations: Start-up, Operation, and Shutdown | AP 603 | Compressor Units: Startup, Operation, Shutdown and Purging Before Returning to Service | CCT |
| Control Room Operations | SCE092 | Enter and Confirm Set-Point | SCE |
| Control Room Operations | SCE092OP | Enter and Confirm Set-Point | CCT |
| Control Room Operations | 818ENB | Response to Notice of Emergency - Gas Control Alliance | CCT |
| Control Room Operations | 806ENB | Controlling Flow and Pressure - Storage | CCT |
| Control Room Operations | 807ENB | Operating Remote Valves - Storage | CCT |
| Control Room Operations | 808ENB | Starting Up and Shutting In a Section of Pipeline - Storage | CCT |
| Control Room Operations | 809ENB | Operating a Compressor - Storage | CCT |
| Control Room Operations | 810ENB | Respond to Alarms Storage Controller | CCT |
| Control Room Operations | 811ENB | Facility Knowledge - Storage | CCT |
| Control Room Operations | AP 638 | Control Room: Emergency Response | CCT |
| Control Room Operations | DCP 630OP | Control Room: Facility Knowledge | CCT |
| Control Room Operations | DCP 631OP | Control Room: Controlling Flow and Pressure | CCT |
| Control Room Operations | DCP 632OP | Control Room: Monitor Gas Quality | CCT |
| Control Room Operations | DCP 633OP | Control Room: Remotely Operate Valves | CCT |
| Control Room Operations | DCP 634OP | Control Room: Starting Up and/or Shutting In a Pipeline Segment | CCT |
| Control Room Operations | DCP 635OP | Control Room: Monitoring, Shutdown and remote changes of Compressor stations from SCADA | CCT |
| Control Room Operations | DCP 636OP | Control Room: Remote Startup, Operation and Shutdown of Pump Stations | CCT |
| Control Room Operations | DCP 637OP | Control Room: Respond to Alarms | CCT |
| Control Room Operations | DCP 638OP | Control Room: Emergency Response | CCT |
| Control Room Operations | CM 633OP | Control Room: Remotely Operate Valves | CCT |
| Control Room Operations | 819ENB | Abnormal Operating Conditions - Gas Control Alliance | CCT |
| Control Room Operations | 817ENB | Normal Operations - Gas Control Alliance | CCT |
| Control Room Operations | VM-630OP | Control Room: Facility Knowledge | CCT |
| Control Room Operations | VM-631OP | Control Room: Controlling Flow and Pressure | CCT |
| Control Room Operations | VM-633OP | Control Room: Remotely Operate Valves | CCT |
| Control Room Operations | VM-634OP | Control Room: Starting Up and/or Shutting In a Pipeline Segment | CCT |
| Control Room Operations | VM-637OP | Control Room: Respond to Alarms | CCT |
| Control Room Operations | VM-638OP | Control Room: Emergency Response | CCT |
| Control Room Operations | FCG 042A OP | Operation of pipeline components by system control (Southern and / or Mid-Atlantic Operations) | CCT |
| Control Room Operations | FCG 042A1 OP | Operation of pipeline components by system control (Mid-Atlantic Operations) | CCT |
| Control Room Operations | FCG 042A2 OP | Operation of pipeline components by system control (Southern Operations) | CCT |
| Control Room Operations | FCG 042B OP | Operation of pipeline components by system control (Compressor Station) | CCT |
| Control Room Operations | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Control Room Operations | FCG 042A | Operation of pipeline components by system control (Southern and / or Mid-Atlantic Operations) | FCG |
| Control Room Operations | FCG 042A1 | Operation of pipeline components by system control (Mid-Atlantic Operations) | FCG |
| Control Room Operations | FCG 042A2 | Operation of pipeline components by system control (Southern Operations) | FCG |
| Control Room Operations | FCG 042B | Operation of pipeline components by system control (Compressor Station) | FCG |
| Control Room Operations | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Control Room Operations | CC-307OP | Control Room: Facility Knowledge | CCT |
| Control Room Operations | CC-308OP | Control Room: Controlling Flow and Pressure | CCT |
| Control Room Operations | CC-309OP | Control Room: Remotely Operate Valves | CCT |
| Control Room Operations | CC-310OP | Control Room: Start-up / Shutdown of Liquid Pipeline to Assure Operation within MOP | CCT |
| Control Room Operations | CC-311OP | Control Room: Remote Startup, Operation and Shutdown of Pump Stations | CCT |
| Control Room Operations | CC-312OP | Control Room: Responding to Alarms | CCT |
| Control Room Operations | CC-313OP | Control Room: Emergency Response | CCT |
| Control Room Operations | SPCC - 110OP | Pipeline Start Up | CCT |
| Control Room Operations | SPCC - 111OP | Pipeline Steady State | CCT |
| Control Room Operations | SPCC - 112OP | Pipeline Shut Down | CCT |
| Control Room Operations | SPCC - 113OP | Storage Facility Movements | CCT |
| Control Room Operations | SPCC - 114OP | Pump Change | CCT |
| Control Room Operations | SPCC - 115OP | Product Swings | CCT |
| Control Room Operations | SPCC - 116OP | Side Stream Injections and Deliveries | CCT |
| Control Room Operations | SPCC - 117OP | Communication Outage | CCT |
| Control Room Operations | SPCC - 118OP | Leak Detection Violation | CCT |
| Control Room Operations | PAA - 43.1 - 43.4 | Control Center Performance Verification | CCT |
| Control Room Operations | CM 631OP | Control Room: Controlling Flow and Pressure | CCT |
| Control Room Operations | CM 636OP | Control Room: Remote Startup, Operation and Shutdown of Pump Stations | CCT |
| Control Room Operations | CM 637OP | Control Room: Respond to Alarms | CCT |
| Control Room Operations | CM 638OP | Control Room: Emergency Response | CCT |
| Control Room Operations | CMP 630 | Control Room: Facility Knowledge | CMP |
| Control Room Operations | CMP 631 | Control Room: Controlling Flow and Pressure | CMP |
| Control Room Operations | CMP 632 | Control Room: Monitor Gas Quality | CMP |
| Control Room Operations | CMP 633 | Control Room: Remotely Operate Valves | CMP |
| Control Room Operations | CMP 634 | Control Room: Starting Up and/or Shutting In a Pipeline Segment | CMP |
| Control Room Operations | CMP 635 | Control Room: Remote Startup, Operation and Shutdown of Compressor Stations | CMP |
| Control Room Operations | CMP 636 | Control Room: Remote Startup, Operation and Shutdown of Pump Stations | CMP |
| Control Room Operations | CMP 637 | Control Room: Respond to Alarms | CMP |
| Control Room Operations | CMP 638 | Control Room: Emergency Response | CMP |
| Corrosion: Inhibitor Injection | SCE026 | Operate and Maintain Chemical Injection Systems | SCE |
| Corrosion: Inhibitor Injection | SCE026OP | Operate and Maintain Chemical Injection Systems | CCT |
| Corrosion: Inhibitor Injection | PAA-10.3 | Vapor Corrosion Inhibitor Monitoring | CCT |
| Corrosion: Inhibitor Injection | PAA-11.0 | Monitoring and Controlling the Injection Rate of the Corrosion Inhibitor | CCT |
| Corrosion: Inhibitor Injection | 475 | Monitoring and Controlling Internal Corrosion (Inhibitor) | CCT |
| Corrosion: Measurement | 418 | General and Localized Corrosion Measurement (Remedial Measures) | CCT |
| Corrosion: Measurement | 008 | Measurement of Wall Thickness with Ultrasonic Device | CCT |
| Corrosion: Measurement | 421 | Measurement of Depth of Pitting with Pit Gage | CCT |
| Corrosion: Measurement | SCE024 | Measure/Evalauate Corrosion of Exposed Pipeline Using Coreval and/or RSTRENG | SCE |
| Corrosion: Measurement | SCE024OP | Measure/Evalauate Corrosion of Exposed Pipeline Using Coreval and/or RSTRENG | CCT |
| Corrosion: Measurement | MW-008i | Measurement of Wall Thickness with Ultrasonic Device (Inspection only) | MWE |
| Corrosion: Measurement | BHP - i008 | Measurement of Wall Thickness with Ultrasonic Device (Inspection only) | BHPFPU |
| Corrosion: Measurement | MW-421i | Measurement of Depth of Pitting with Pit Gage (Inspection) | MWE |
| Corrosion: Measurement | FCG 033A OP | Leak repairs: Includes Use of Pit Depth Gauge | CCT |
| Corrosion: Measurement | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Corrosion: Measurement | FCG 033A | Leak repairs: Includes Use of Pit Depth Gauge | FCG |
| Corrosion: Measurement | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Corrosion: Measurement | AP 418 | General and Localized Corrosion Measurement (Remedial Measures) | CCT |
| Corrosion: Measurement | TC-490 | Evaluate Remaining Strength using RSTRENG | TC |
| Corrosion: Monitoring/Inspection (Bacterial Testing) | 429 | Monitoring for corrosion - bacteria testing - serial dilution method (MIC) | CCT |
| Corrosion: Monitoring/Inspection (External Surfaces) | 417 | Atmospheric Corrosion Monitoring | CCT |
| Corrosion: Monitoring/Inspection (External Surfaces) | OQ-0141 | Task 0141 Visual Inspection for Atmospheric Corrosion | DOM |
| Corrosion: Monitoring/Inspection (External Surfaces) | OQ-0141 | Task 0141 Visual Inspection for Atmospheric Corrosion | DOMHOPE |
| Corrosion: Monitoring/Inspection (External Surfaces) | OQ-0146 | Task 0146 Visual Inspection for Atmospheric Corrosion - Interior Service Lines | DOM |
| Corrosion: Monitoring/Inspection (External Surfaces) | OQ-0146 | Task 0146 Visual Inspection for Atmospheric Corrosion - Interior Service Lines | DOMHOPE |
| Corrosion: Monitoring/Inspection (External Surfaces) | SCE010 | Perform Atmospheric Corrosion Inspection | SCE |
| Corrosion: Monitoring/Inspection (External Surfaces) | SCE010OP | Perform Atmospheric Corrosion Inspection | CCT |
| Corrosion: Monitoring/Inspection (External Surfaces) | TC-008-I | Measurement of Wall Thickness with Ultrasonic Device (Inspection only) | TC |
| Corrosion: Monitoring/Inspection (External Surfaces) | LBGO 417OP | Atmospheric Corrosion Monitoring | CCT |
| Corrosion: Monitoring/Inspection (External Surfaces) | CM 417OP | Atmospheric Corrosion Monitoring | CCT |
| Corrosion: Monitoring/Inspection (External Surfaces) | LBGO 417 | Atmospheric Corrosion Monitoring | LBGO |
| Corrosion: Monitoring/Inspection (External Surfaces) | VM-417OP | Atmospheric Corrosion Monitoring | CCT |
| Corrosion: Monitoring/Inspection (External Surfaces) | OQ-0191 | Task 0191 Measure Atmospheric Corrosion | DOM |
| Corrosion: Monitoring/Inspection (External Surfaces) | FCG 005A OP | ECC: Corrosion control - atmospheric | CCT |
| Corrosion: Monitoring/Inspection (External Surfaces) | FCG 005B OP | ECC: Corrosion control - atmospheric meter sets | CCT |
| Corrosion: Monitoring/Inspection (External Surfaces) | FCG 005C OP | ECC: Corrosion control - atmospheric | CCT |
| Corrosion: Monitoring/Inspection (External Surfaces) | FCG 006A OP | ECC: Corrosion control - evaluation of exposed pipe | CCT |
| Corrosion: Monitoring/Inspection (External Surfaces) | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Corrosion: Monitoring/Inspection (External Surfaces) | FCG 005A | ECC: Corrosion control - atmospheric | FCG |
| Corrosion: Monitoring/Inspection (External Surfaces) | FCG 005B | ECC: Corrosion control - atmospheric meter sets | FCG |
| Corrosion: Monitoring/Inspection (External Surfaces) | FCG 005C | ECC: Corrosion control - atmospheric | FCG |
| Corrosion: Monitoring/Inspection (External Surfaces) | FCG 006A | ECC: Corrosion control - evaluation of exposed pipe | FCG |
| Corrosion: Monitoring/Inspection (External Surfaces) | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Corrosion: Monitoring/Inspection (External Surfaces) | CC-106OP | Inspect For Atmospheric Corrosion - Visual | CCT |
| Corrosion: Monitoring/Inspection (Internal Surfaces) | 414 | Inspect for Internal Corrosion Whenever Pipe is Removed | CCT |
| Corrosion: Monitoring/Inspection (Internal Surfaces) | 415 | Monitoring for Internal Corrosion with Probes and Coupons | CCT |
| Corrosion: Monitoring/Inspection (Internal Surfaces) | 416 | Monitoring for Internal Corrosion with Gas Samples | CCT |
| Corrosion: Monitoring/Inspection (Internal Surfaces) | 718 | Monitoring for Internal Corrosion with Liquid Samples | CCT |
| Corrosion: Monitoring/Inspection (Internal Surfaces) | OQ-0161 | Task 0161 Visual Inspection for Internal Corrosion | DOM |
| Corrosion: Monitoring/Inspection (Internal Surfaces) | OQ-0161 | Task 0161 Visual Inspection for Internal Corrosion | DOMHOPE |
| Corrosion: Monitoring/Inspection (Internal Surfaces) | OQ-0131 | Task 0131 Insert and Remove Coupons / Probes for Internal Corrosion Monitoring | DOM |
| Corrosion: Monitoring/Inspection (Internal Surfaces) | OQ-0131 | Task 0131 Insert and Remove Coupons / Probes for Internal Corrosion Monitoring | DOMHOPE |
| Corrosion: Monitoring/Inspection (Internal Surfaces) | SCE007 | Install/Remove Corrosion Coupons and Electronic Probes For Analysis | SCE |
| Corrosion: Monitoring/Inspection (Internal Surfaces) | SCE007OP | Install/Remove Corrosion Coupons and Electronic Probes For Analysis | CCT |
| Corrosion: Monitoring/Inspection (Internal Surfaces) | SCE019 | Inspect Internal Surface of Piping/Components | SCE |
| Corrosion: Monitoring/Inspection (Internal Surfaces) | SCE019OP | Inspect Internal Surface of Piping/Components | CCT |
| Corrosion: Monitoring/Inspection (Internal Surfaces) | SCE020 | Perform Sampling/Testing for Internal Corrosion | SCE |
| Corrosion: Monitoring/Inspection (Internal Surfaces) | SCE020OP | Perform Sampling/Testing for Internal Corrosion | CCT |
| Corrosion: Monitoring/Inspection (Internal Surfaces) | SCE021 | Install/Remove/Collect Measurements on Coupons and Electronic Probes | SCE |
| Corrosion: Monitoring/Inspection (Internal Surfaces) | SCE021OP | Install/Remove/Collect Measurements on Coupons and Electronic Probes | CCT |
| Corrosion: Monitoring/Inspection (Internal Surfaces) | LBGO 414OP | Inspect for Internal Corrosion Whenever Pipe is Removed | CCT |
| Corrosion: Monitoring/Inspection (Internal Surfaces) | CM 415OP | Monitoring for Internal Corrosion with Probes and Coupons | CCT |
| Corrosion: Monitoring/Inspection (Internal Surfaces) | LBGO 414 | Inspect for Internal Corrosion Whenever Pipe is Removed | LBGO |
| Corrosion: Monitoring/Inspection (Internal Surfaces) | VM-414OP | Inspect for Internal Corrosion Whenever Pipe is Removed | CCT |
| Corrosion: Monitoring/Inspection (Internal Surfaces) | FCG 029A OP | Internal corrosion control | CCT |
| Corrosion: Monitoring/Inspection (Internal Surfaces) | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Corrosion: Monitoring/Inspection (Internal Surfaces) | FCG 029A | Internal corrosion control | FCG |
| Corrosion: Monitoring/Inspection (Internal Surfaces) | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Corrosion: Monitoring/Inspection (Internal Surfaces) | CC-132OP | Insert and Remove Coupons for Internal Corrosion Monitoring | CCT |
| Corrosion: Monitoring/Inspection (Internal Surfaces) | CC-138OP | Inspect Internal Pipe Surface | CCT |
| Corrosion: Monitoring/Inspection (Specialized Survey Assessment Methods) | 423 | Perform Direct Current Voltage Gradient (DCVG) Survey | CCT |
| Corrosion: Monitoring/Inspection (Specialized Survey Assessment Methods) | 424 | Perform AC Current Attenuation (ACCA) Survey | CCT |
| Corrosion: Monitoring/Inspection (Specialized Survey Assessment Methods) | 425 | Perform Alternating Current Voltage Gradient (ACVG) Survey | CCT |
| Corrosion: Monitoring/Inspection (Specialized Survey Assessment Methods) | 436 | Perform Close Interval Survey | CCT |
| Corrosion: Monitoring/Inspection (Specialized Survey Assessment Methods) | 437 | Perform Hot Spot Survey | CCT |
| Corrosion: Monitoring/Inspection (Specialized Survey Assessment Methods) | FCG 007C OP | Operation of Current Interrupter | CCT |
| Corrosion: Monitoring/Inspection (Specialized Survey Assessment Methods) | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Corrosion: Monitoring/Inspection (Specialized Survey Assessment Methods) | FCG 007C | Operation of Current Interrupter | FCG |
| Corrosion: Monitoring/Inspection (Specialized Survey Assessment Methods) | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Corrosion: Pipeline Evaluation | 490 | Evaluate Remaining Strength using RSTRENG | CCT |
| CPM Leak Detection | SCE090 | Computational Pipeline Monitoring (CPM) Leak Detection System | SCE |
| CPM Leak Detection | SCE090OP | Computational Pipeline Monitoring (CPM) Leak Detection System | CCT |
| CPM Leak Detection | 011 | Inspect, Test and Maintain Computational Pipeline Monitoring (CPM) Sensing Devices | CCT |
| CPM Leak Detection | 012 | Inspect, Test and Maintain Liquid Leak Detection Flow Computers | CCT |
| CPM Leak Detection | 013 | Inspect, maintain, and Test Tank Gauges for CPM Hazardous Liquid Leak Detection | CCT |
| CPM Leak Detection | 014 | Maintain/Prove Flow Meters for CPM Hazardous Liquid Leak Detection | CCT |
| CPM Leak Detection | 015 | Inspect, Test and Maintain Gravitometers/Densitometers for CPM Hazardous Liquid Leak Detection | CCT |
| CPM Leak Detection | 9022 | Inspect, Test, and Replace, Tank Gauges for CPM Hazardous Liquid Leak Detection | CCT |
| CPM Leak Detection | CM 013OP | Inspect, Maintain, and Test Tank Gauges for CPM Hazardous Liquid Leak Detection | CCT |
| CPM Leak Detection | CM 014OP | Maintain/Prove Flow Meters for CPM Hazardous Liquid Leak Detection | CCT |
| Customer Meters and Regulators | OQ-1161 | Task 1161 Installation of Customer Meters and Regulators - Residential and Small Commercial | DOM |
| Customer Meters and Regulators | OQ-1161 | Task 1161 Installation of Customer Meters and Regulators - Residential and Small Commercial | DOMHOPE |
| Customer Meters and Regulators | 302 | Installation of Customer Meters and Service Regulators (Residential and Small Commercial) | CCT |
| Customer Meters and Regulators | 303 | Installing Customer Meters: Large Commercial and Industrial | CCT |
| Customer Meters and Regulators | 304 | Installing Customer Pressure Regulating, Limiting, and Relief Device - Large Commercial & Industrial | CCT |
| Customer Meters and Regulators | LBGO 302OP | Installation of Customer Meters and Service Regulators (Residential and Small Commercial | CCT |
| Customer Meters and Regulators | WGD-305 | In service meters | DEUWI |
| Customer Meters and Regulators | FCG 024A OP | Installation of customers' meters and regulators | CCT |
| Customer Meters and Regulators | FCG 024B OP | Installation of customers' meters and regulators - meter express (prefabricated) | CCT |
| Customer Meters and Regulators | FCG 028C OP | Residential Regulators and Building Wall Regulator Stations | CCT |
| Customer Meters and Regulators | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Customer Meters and Regulators | FCG 061A OP | Drilling and Tapping of Meter Casing | CCT |
| Customer Meters and Regulators | FCG 024A | Installation of customers' meters and regulators | FCG |
| Customer Meters and Regulators | FCG 024B | Installation of customers' meters and regulators - meter express (prefabricated) | FCG |
| Customer Meters and Regulators | FCG 028C | Residential Regulators and Building Wall Regulator Stations | FCG |
| Customer Meters and Regulators | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Customer Meters and Regulators | FCG 061A | Drilling and Tapping of Meter Casing | FCG |
| Damage Prevention | 607 | Damage Prevention: Observation of Excavating and Backfilling | CCT |
| Damage Prevention | OQ-1321 | Task 1321 Damage Prevention during Excavation Activities By or On Behalf of the Operator | DOM |
| Damage Prevention | OQ-1321 | Task 1321 Damage Prevention during Excavation Activities By or On Behalf of the Operator | DOMHOPE |
| Damage Prevention | OQ-1341 | Task 1341 Provide or Assure Adequate Pipeline Support During Operator Initiated Excavation Activities | DOM |
| Damage Prevention | OQ-1341 | Task 1341 Provide or Assure Adequate Pipeline Support During Operator Initiated Excavation Activities | DOMHOPE |
| Damage Prevention | SCE034 | Excavate Loaded Pipelines Using Heavy Equipment | SCE |
| Damage Prevention | SCE034OP | Excavate Loaded Pipelines Using Heavy Equipment | CCT |
| Damage Prevention | 900 | ROW Observance (Identifying Foreign Facilities) | CCT |
| Damage Prevention | 901 | Hauling, Stringing and Handling Pipe | CCT |
| Damage Prevention | 906 | Rights-of-Way Cleanup | CCT |
| Damage Prevention | 909 | Data Collection for As-Built Pipe Location Documentation | CCT |
| Damage Prevention | AGL-019A | Hazard Control | AGL |
| Damage Prevention | 619 | Damage Prevention during Vacuum Excavation | CCT |
| Damage Prevention | CHK-909i | Data Collection for As-Built Pipe Location Documentation (Inspection only) | CEC |
| Damage Prevention | ACMP-605TXOP | TRRC 18.8 Training | CCT |
| Damage Prevention | CHK-909 | Data Collection for As-Built Pipe Location Documentation | CEC |
| Damage Prevention | MW-901i | Hauling, Stringing and Handling Pipe | MWE |
| Damage Prevention | MW-909i | Data Collection for As-Built Pipe Location Documentation (Inspection Only) | MWE |
| Damage Prevention | OPNSA-i909 | Data Collection for As-Built Pipe Location Documentation | OPNA |
| Damage Prevention | OPNSA-i909OP | Data Collection for As-Built Pipe Location Documentation | CCT |
| Damage Prevention | LBGO 607OP | Damage Prevention: Observation of Excavating and Backfilling | CCT |
| Damage Prevention | OKE 621 | Provide or Assure Adequate Pipeline Support during Operator Initiated Excavation Activities (G1341) | ONEOK |
| Damage Prevention | 621 | Provide or Assure Adequate Pipeline Support during Operator Initiated Excavation Activities | CCT |
| Damage Prevention | KRGT-0011OP | Depth of Cover Verification | CCT |
| Damage Prevention | LBGO 607 | Damage Prevention: Observation of Excavating and Backfilling | LBGO |
| Damage Prevention | MW-607i | Damage Prevention: Observation of Excavating and Backfilling (Inspection) | MWE |
| Damage Prevention | VM-619OP | Damage Prevention during Vacuum Excavation and Backfilling Activities | CCT |
| Damage Prevention | VM-607OP | Damage Prevention: Observation of Excavating and Backfilling | CCT |
| Damage Prevention | VM-605OP | Locate Line/Install Temporary Marking of Buried Pipeline | CCT |
| Damage Prevention | VM-621OP | Provide or Assure Adequate Pipeline Support during Operator Initiated Excavation Activities | CCT |
| Damage Prevention | FCG 004A OP | Damage Prevention Inspection | CCT |
| Damage Prevention | FCG 004B OP | Damage Prevention Inspection (Excavation) | CCT |
| Damage Prevention | FCG 019A OP | Hazard control | CCT |
| Damage Prevention | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Damage Prevention | FCG 004A | Damage Prevention Inspection | FCG |
| Damage Prevention | FCG 004B | Damage Prevention Inspection (Excavation) | FCG |
| Damage Prevention | FCG 019A | Hazard control | FCG |
| Damage Prevention | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Damage Prevention | CC-702OP | Inspection of Construction Activities | CCT |
| Damage Prevention | CC-902OP | Damage Prevention: Observation of Excavating and Backfilling | CCT |
| Damage Prevention | CC-903OP | ROW Observance (Identifying Foreign Facilities) | CCT |
| Damage Prevention | CC-907OP | Damage Prevention for Blasting Near a Pipeline | CCT |
| Damage Prevention | TC-619-I | Damage Prevention during Vacuum Excavation (Inspection Only) | TC |
| Damage Prevention | LEG 619 | Observation of Vacuum Excavation for Damage Prevention | CCT |
| Damage Prevention (Blasting Activities) | 608 | Damage Prevention for Blasting Near a Pipeline | CCT |
| Damage Prevention (Blasting Activities) | MW-900i | ROW Observance (Identifying Foreign Facilities) | MWE |
| Damage Prevention (Blasting Activities) | MW-608i | Damage Prevention for Blasting Near a Pipeline (Inspection) | MWE |
| Examine Pipe and Components for Damage/Defects | 401 | Examination of Buried Pipelines When Exposed | CCT |
| Examine Pipe and Components for Damage/Defects | OQ-0151 | Task 0151 Visual Inspection of Buried Pipe and Components When Exposed | DOM |
| Examine Pipe and Components for Damage/Defects | OQ-0151 | Task 0151 Visual Inspection of Buried Pipe and Components When Exposed | DOMHOPE |
| Examine Pipe and Components for Damage/Defects | OQ-0201 | Task 0201 Visual Inspection of Installed Pipe and Components for Mechanical Damage | DOM |
| Examine Pipe and Components for Damage/Defects | OQ-0201 | Task 0201 Visual Inspection of Installed Pipe and Components for Mechanical Damage | DOMHOPE |
| Examine Pipe and Components for Damage/Defects | OQ-0641 | Task 0641 Visually Inspect Pipe and Components Prior to Installation | DOM |
| Examine Pipe and Components for Damage/Defects | OQ-0641 | Task 0641 Visually Inspect Pipe and Components Prior to Installation | DOMHOPE |
| Examine Pipe and Components for Damage/Defects | SCE006 | Inspect Buried Pipe When Exposed | SCE |
| Examine Pipe and Components for Damage/Defects | SCE006OP | Inspect Buried Pipe When Exposed | CCT |
| Examine Pipe and Components for Damage/Defects | 904 | Inspection of Material | CCT |
| Examine Pipe and Components for Damage/Defects | KRGT-0007 | Monitoring Strain Gauges | KRGT |
| Examine Pipe and Components for Damage/Defects | 434 | Visual Inspection of Installed Pipe and Components for Mechanical Damage | CCT |
| Examine Pipe and Components for Damage/Defects | 435 | Measure and Identify Mechanical Damage on Installed Pipe and Components | CCT |
| Examine Pipe and Components for Damage/Defects | 110 | Pipeline Expansion External Measurement | CCT |
| Examine Pipe and Components for Damage/Defects | LBGO 401OP | Examination of Buried Pipelines When Exposed (Steel) | CCT |
| Examine Pipe and Components for Damage/Defects | LBGO 435OP | Measure and Identify Mechanical Damage on Installed Pipe and Components | CCT |
| Examine Pipe and Components for Damage/Defects | LBGO 434OP | Visual Inspection of Installed Pipe and Components for Mechanical Damage | CCT |
| Examine Pipe and Components for Damage/Defects | CM 401OP | Examination of Buried Pipelines When Exposed | CCT |
| Examine Pipe and Components for Damage/Defects | OKE 313 | Visually Inspect Pipe and Components Prior to Installation (G0641) | ONEOK |
| Examine Pipe and Components for Damage/Defects | LBGO 401 | Examination of Buried Pipelines When Exposed (Steel) | LBGO |
| Examine Pipe and Components for Damage/Defects | LBGO 434 | Visual Inspection of Installed Pipe and Components for Mechanical Damage | LBGO |
| Examine Pipe and Components for Damage/Defects | VM-401OP | Examination of Buried Pipelines When Exposed | CCT |
| Examine Pipe and Components for Damage/Defects | VM-434OP | Visual Inspection of Installed Pipe and Components for Mechanical Damage | CCT |
| Examine Pipe and Components for Damage/Defects | VM-435OP | Measure and Identify Mechanical Damage on Installed Pipe and Components | CCT |
| Examine Pipe and Components for Damage/Defects | VM-904OP | Inspection of Material | CCT |
| Examine Pipe and Components for Damage/Defects | FCG 058A OP | Inspection of Copper Pipe | CCT |
| Examine Pipe and Components for Damage/Defects | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Examine Pipe and Components for Damage/Defects | FCG 058A | Inspection of Copper Pipe | FCG |
| Examine Pipe and Components for Damage/Defects | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Examine Pipe and Components for Damage/Defects | CC-136OP | Examination of Exposed Buried Pipelines for Coating Condition and Corrosion | CCT |
| Examine Pipe and Components for Damage/Defects | CC-701OP | Visually Inspect Pipe and Pipe Components | CCT |
| Examine Pipe and Components for Damage/Defects | CC-703OP | Visual Inspection of Installed Pipe and Components for Mechanical Damage | CCT |
| Examine Pipe and Components for Damage/Defects | CM 435OP | Measure and Identify Mechanical Damage on Installed Pipe and Components | CCT |
| Fiberglass Pipe Procedures | OQ-0856 | OQ-0856 Fiberglass Pipe - Install Permanent Fittings Using Epoxy Adhesive | DOM |
| Flaring and Venting | CT1001 | The Use of Portable Flares | MWE |
| Flaring and Venting | CT1001OP | The Use of Portable Flares | CCT |
| Gas Detection and Alarm Systems: Testing/Maintenance | 713 | Test/Maintain Gas Detection and Alarm Systems | CCT |
| Gas Detection and Alarm Systems: Testing/Maintenance | SCE069 | Test/Maintain/Repair Gas Detection & Fire Eye System Equipment | SCE |
| Gas Detection and Alarm Systems: Testing/Maintenance | SCE069OP | Test/Maintain/Repair Gas Detection & Fire Eye System Equipment | CCT |
| Gas Detection and Alarm Systems: Testing/Maintenance | AP 713 | Test/Maintain Gas Detection and Alarm Systems | CCT |
| Gas Quality Monitoring | SCE050 | Configure Meter Station Alarm Settings and/or Shut-in Valves | SCE |
| Gas Quality Monitoring | SCE050OP | Configure Meter Station Alarm Settings and/or Shut-in Valves | CCT |
| Gas Quality Monitoring | SCE067 | Operate/Maintain/Repair Gas Dehydration System | SCE |
| Gas Quality Monitoring | SCE067OP | Operate/Maintain/Repair Gas Dehydration System | CCT |
| Gas Quality Monitoring | SCE068 | Operate/Maintain/Gas Treating Plant/Amine System | SCE |
| Gas Quality Monitoring | SCE068OP | Operate/Maintain/Gas Treating Plant/Amine System | CCT |
| Gas Quality Monitoring | SCE073 | Startup/Shutdown of Dehydration System | SCE |
| Gas Quality Monitoring | SCE073OP | Startup/Shutdown of Dehydration System | CCT |
| Gas Quality Monitoring | SCE074 | Troubleshoot/Repair Gas Dehydration System | SCE |
| Gas Quality Monitoring | SCE074OP | Troubleshoot/Repair Gas Dehydration System | CCT |
| Gas Quality Monitoring | SCE093 | Monitor Gas Quality to Ensure Within Tarrif Limits | SCE |
| Gas Quality Monitoring | SCE093OP | Monitor Gas Quality to Ensure Within Tarrif Limits | CCT |
| Gas Quality Monitoring | 921 | Operate/Test/Maintain Sulfur (H2S) Analyzers | CCT |
| Gas Quality Monitoring | 922 | Operate/Test/Maintain Moisture Analyzers | CCT |
| Gas Quality Monitoring | 923 | Operate/Test/Maintain Gas Chromatograph Analyzers | CCT |
| Gas Quality Monitoring | KRGT-0014 | Operate/Test/Maintain Oxygen O2 Analyzer | KRGT |
| Gas Quality Monitoring | KRGT-0014OP | Operate/Test/Maintain Oxygen O2 Analyzer | CCT |
| General Pipeline Repair Activities | SCE063 | Perform Basic Cutting Operations | SCE |
| General Pipeline Repair Activities | SCE063OP | Perform Basic Cutting Operations | CCT |
| General Pipeline Repair Activities | FCG 033B OP | Leak repairs: Above Ground Leak Repair Including Replacement of Service Valve | CCT |
| General Pipeline Repair Activities | FCG 033C OP | Leak repairs: Above Ground Leak Repair Excluding Replacement of Service Valve | CCT |
| General Pipeline Repair Activities | FCG 033D OP | Leak Repairs: Medium BTU Landfill Gas Pipelines | CCT |
| General Pipeline Repair Activities | FCG 033E OP | Leak Repairs: Above Ground Leak Repair by Tightening (Survey Contractor) | CCT |
| General Pipeline Repair Activities | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| General Pipeline Repair Activities | FCG 033B | Leak repairs: Above Ground Leak Repair Including Replacement of Service Valve | FCG |
| General Pipeline Repair Activities | FCG 033C | Leak repairs: Above Ground Leak Repair Excluding Replacement of Service Valve | FCG |
| General Pipeline Repair Activities | FCG 033D | Leak Repairs: Medium BTU Landfill Gas Pipelines | FCG |
| General Pipeline Repair Activities | FCG 033E | Leak Repairs: Above Ground Leak Repair by Tightening (Survey Contractor) | FCG |
| General Pipeline Repair Activities | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Guided Wave Ultrasonic Testing | 422 | Assessment of Pipeline Segments Using Long Range Guided Wave UT | CCT |
| Guided Wave Ultrasonic Testing | 491 | Assessment of Pipeline Segments Using Long Range Guided Wave UT (Eddyfi) | CCT |
| Guided Wave Ultrasonic Testing | 492 | Assessment of Pipeline Segments Using Long Range Guided Wave UT (Guided Ultrasonics (GULT)) | CCT |
| Guided Wave Ultrasonic Testing | 493 | Assessment of Pipeline Segments Using Long Range Guided Wave UT (Guided Wave Analysis LLC (GWAnalysis)) | CCT |
| Hot Tapping | 611 | Hot Tap (Steel Pipe) | CCT |
| Hot Tapping | 612 | Hot Tap (Plastic Pipe) | CCT |
| Hot Tapping | OQ-1086 | Task 1086 Tapping a Pipeline Through an Installed Valve (Tap Diameter 4 Inch and Less) | DOM |
| Hot Tapping | OQ-1086 | Task 1086 Tapping a Pipeline Through an Installed Valve (Tap Diameter 4 Inch and Less) | DOMHOPE |
| Hot Tapping | OQ-1101 | Task 1101 Tapping a Pipeline with a Built-in Cutter | DOM |
| Hot Tapping | OQ-1101 | Task 1101 Tapping a Pipeline with a Built-in Cutter | DOMHOPE |
| Hot Tapping | SCE043 | Operate/Maintain Hot Tapping Equipment | SCE |
| Hot Tapping | SCE043OP | Operate/Maintain Hot Tapping Equipment | CCT |
| Hot Tapping | CHK-611i | Hot Tap (Steel Pipe) (Inspection only) | CEC |
| Hot Tapping | OQ-1081 | Task 1081 Tapping a Pipeline (Tap Diameter 4 Inch and Less) | DOM |
| Hot Tapping | OQ-1081 | Task 1081 Tapping a Pipeline (Tap Diameter 4 Inch and Less) | DOMHOPE |
| Hot Tapping | MW-611i | Hot Tap (Steel Pipe) (Inspection only) | MWE |
| Hot Tapping | LBGO 612OP | Hot Tap (Small Diameter Steel Pipe) | CCT |
| Hot Tapping | CM 611OP | Tapping - TDW T101 Tapping Machine | CCT |
| Hot Tapping | CUC 222 | PE Tapping Tee (Outlet Sizes up to 2'') | CHUT |
| Hot Tapping | CUC 222OP | PE Tapping Tee (Outlet Sizes up to 2'') | CCT |
| Hot Tapping | LBGO 611 | Hot Tap (Large Diameter Steel Pipe) | LBGO |
| Hot Tapping | LBGO 612 | Hot Tap (Small Diameter Steel Pipe) | LBGO |
| Hot Tapping | CUC 223 | Steel Tapping with Bolt On Saddle & Punch Tee | CHUT |
| Hot Tapping | CUC 223OP | Steel Tapping with Bolt On Saddle & Punch Tee | CCT |
| Hot Tapping | FPU 1101 | Hot Tap with Built-In Cutter (Steel Pipe) | FPU |
| Hot Tapping | FCG 051A OP | Tapping Steel Pipe ½'' to 2½'' | CCT |
| Hot Tapping | FCG 051B OP | Tapping Plastic Pipe | CCT |
| Hot Tapping | FCG 051C OP | Tapping Steel Pipe 3'' and above | CCT |
| Hot Tapping | FCG 051DOP | Tapping Self-Tapping | CCT |
| Hot Tapping | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Hot Tapping | FCG 051A | Tapping Steel Pipe ½'' to 2½'' | FCG |
| Hot Tapping | FCG 051B | Tapping Plastic Pipe | FCG |
| Hot Tapping | FCG 051C | Tapping Steel Pipe 3'' and above | FCG |
| Hot Tapping | FCG 051D | Tapping Self-Tapping | FCG |
| Hot Tapping | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Hot Tapping | 611ENB | Performing Hot Tap (Steel Pipe) | CCT |
| Hot Tapping | 627 | Tapping Pipe with Built-in Cutter | CCT |
| Hot Tapping | SCSD-6.6-Evaluation | 49 CFR 192.627 - Tapping Pipelines under pressure (PE 2" diameter or less)-Evaluation | SOCAL |
| Inspect Navigable Waterway Crossing | SCE088 | Inspect Navigable Waterway Crossing | SCE |
| Inspect Navigable Waterway Crossing | SCE088OP | Inspect Navigable Waterway Crossing | CCT |
| Inspect Navigable Waterway Crossing | COP 017OP | Monitor Drilled or Bored Crossing | CCT |
| Inspect Navigable Waterway Crossing | 018 | Inspect Navigable Waterway Crossing | CCT |
| Installation of Pipe Above Ground | OQ-0951 | Task 0951 Installation of Pipe Above Ground | DOM |
| Installation of Pipe Above Ground | OQ-0951 | Task 0951 Installation of Pipe Above Ground | DOMHOPE |
| Installation of Pipe Above Ground | DCG 325OP | Installation of Above Ground Pipe | CCT |
| Installation of Pipe Above Ground | OKE 325 | Installation of Above Ground Pipe (G0951) | ONEOK |
| Installation of Pipe Above Ground | 325 | Installation of Above Ground Pipe | CCT |
| Installation of Pipe Above Ground | BHE 351 | Temporary Installation of Plastic Pipe Above Ground | BHE |
| Leak/Strength Testing | 501 | Conduct a Pressure Test | CCT |
| Leak/Strength Testing | 502 | Conduct Pressure Test on Pipe that is to be Operated at a Pressure | CCT |
| Leak/Strength Testing | OQ-0571 | Task 0571 Pressure Test - Non-liquid Medium - Test Pressure Greater Than or Equal To 100 psi | DOM |
| Leak/Strength Testing | OQ-0571 | Task 0571 Pressure Test - Non-liquid Medium - Test Pressure Greater Than or Equal To 100 psi | DOMHOPE |
| Leak/Strength Testing | OQ-0561 | Task 0561 Pressure Test - Non-liquid Medium -Test Pressure Less Than 100 psi | DOM |
| Leak/Strength Testing | OQ-0561 | Task 0561 Pressure Test - Non-liquid Medium -Test Pressure Less Than 100 psi | DOMHOPE |
| Leak/Strength Testing | OQ-0581 | Task 0581 Pressure Test - Liquid Medium | DOM |
| Leak/Strength Testing | OQ-0581 | Task 0581 Pressure Test - Liquid Medium | DOMHOPE |
| Leak/Strength Testing | OQ-0591 | Task 0591 Leak Test at Operating Pressure | DOM |
| Leak/Strength Testing | OQ-0591 | Task 0591 Leak Test at Operating Pressure | DOMHOPE |
| Leak/Strength Testing | SCE027 | Perform/Inspect Pressure Test | SCE |
| Leak/Strength Testing | SCE027OP | Perform/Inspect Pressure Test | CCT |
| Leak/Strength Testing | CHK-501i | Conduct Pressure Test to Substantiate MAOP / MOP (Inspection only) | CEC |
| Leak/Strength Testing | MW-501i | Conduct Pressure Test to Substantiate MAOP / MOP (Inspection only) | MWE |
| Leak/Strength Testing | OPNSA-i502 | Conduct Pressure Test on Pipe that is to be Operated at a Pressure | OPNA |
| Leak/Strength Testing | OPNSA-i502OP | Conduct Pressure Test on Pipe that is to be Operated at a Pressure | CCT |
| Leak/Strength Testing | OPNSA-i501 | Conduct a Pressure Test (Inspection only) | OPNA |
| Leak/Strength Testing | OPNSA-i501OP | Conduct a Pressure Test (Inspection only) | CCT |
| Leak/Strength Testing | BHP - i501 | Conduct a Pressure Test (Inspection only) | BHPFPU |
| Leak/Strength Testing | LBGO 502OP | Conduct Pressure Test on Pipe that is less than 100 psig | CCT |
| Leak/Strength Testing | LBGO 501 | Conduct a Pressure Test Greater than 100 psig | LBGO |
| Leak/Strength Testing | LBGO 502 | Conduct Pressure Test on Pipe that is less than 100 psig | LBGO |
| Leak/Strength Testing | MW-502i | Conduct Pressure Test on Pipe that is to be Operated at a Pressure | MWE |
| Leak/Strength Testing | FCG 045A OP | Pressure testing lines | CCT |
| Leak/Strength Testing | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Leak/Strength Testing | FCG 045A | Pressure testing lines | FCG |
| Leak/Strength Testing | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Leakage Survey | 702 | Leakage Survey with Leak Detection Device | CCT |
| Leakage Survey | 723 | Leakage Survey with Remote Laser Leak Detection Device | CCT |
| Leakage Survey | OQ-1285 | Task 1285 Interior Service Line Leak Survey - Meter Reader | DOM |
| Leakage Survey | OQ-1285 | Task 1285 Interior Service Line Leak Survey - Meter Reader | DOMHOPE |
| Leakage Survey | OQ-1241 | Task 1241 Outside Gas Leak Investigation | DOM |
| Leakage Survey | 651 | Outside Gas Leak Investigation | CCT |
| Leakage Survey | 650 | Inside Gas Leak Investigation | CCT |
| Leakage Survey | LBGO 651OP | Outside Gas Leak Investigation | CCT |
| Leakage Survey | LBGO 702OP | Leakage Survey with Leak Detection Device | CCT |
| Leakage Survey | LBGO 652OP | Outside Gas Leak Investigation - Gas Services | CCT |
| Leakage Survey | 017 | Hazardous Liquid Leak Investigation | CCT |
| Leakage Survey | FCG 032A OP | Leak investigation | CCT |
| Leakage Survey | FCG 032B OP | Leak investigation Propane | CCT |
| Leakage Survey | FCG 032C OP | Leak investigation (Survey contractors) | CCT |
| Leakage Survey | FCG 032D OP | Inside Leak Investigation | CCT |
| Leakage Survey | FCG 032E OP | Above Ground Leak Investigation and Repair | CCT |
| Leakage Survey | FCG 032F OP | Leak Investigation Medium BTU Landfill Gas Pipelines | CCT |
| Leakage Survey | FCG 032G OP | Leak Investigation Including GPS Tracking | CCT |
| Leakage Survey | FCG 034A OP | Leak survey | CCT |
| Leakage Survey | FCG 034B OP | Leak survey Propane | CCT |
| Leakage Survey | FCG 034C OP | Leak survey (Survey Contractors) | CCT |
| Leakage Survey | FCG 034D OP | Leak Survey Medium BTU Landfill Gas Pipelines | CCT |
| Leakage Survey | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Leakage Survey | FCG 032A | Leak investigation | FCG |
| Leakage Survey | FCG 032B | Leak investigation Propane | FCG |
| Leakage Survey | FCG 032C | Leak investigation (Survey contractors) | FCG |
| Leakage Survey | FCG 032D | Inside Leak Investigation | FCG |
| Leakage Survey | FCG 032E | Above Ground Leak Investigation and Repair | FCG |
| Leakage Survey | FCG 032F | Leak Investigation Medium BTU Landfill Gas Pipelines | FCG |
| Leakage Survey | FCG 032G | Leak Investigation Including GPS Tracking | FCG |
| Leakage Survey | FCG 034A | Leak survey | FCG |
| Leakage Survey | FCG 034B | Leak survey Propane | FCG |
| Leakage Survey | FCG 034C | Leak survey (Survey Contractors) | FCG |
| Leakage Survey | FCG 034D | Leak Survey Medium BTU Landfill Gas Pipelines | FCG |
| Leakage Survey | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Leakage Survey | SPL 5230 | Perform Walking Gas Leakage Survey | SIN |
| Leakage Survey (Aerial) | GTN1205 | Aerial Leakage Survey: Transmission | TC |
| Leakage Survey (Aerial) | 725 | Aerial Leakage Survey: Transmission | CCT |
| Leakage Survey (Aerial) | 728 | Aerial Leakage Survey: Transmission (UV/IR) | CCT |
| Leakage Survey (Aerial) | OQ-1282 | Task 1282 Leakage Survey - Aerial | DOM |
| Line Stopping: Operation and Maintenance | SCE042 | Operate/Maintain Stopple Equipment | SCE |
| Line Stopping: Operation and Maintenance | SCE042OP | Operate/Maintain Stopple Equipment | CCT |
| Line Stopping: Operation and Maintenance | 762 | Line Stopping Utilizing a Hot Tap Fitting | CCT |
| Line Stopping: Operation and Maintenance | LBGO 760OP | Line Stopping Utilizing a Steel Wedge Stopper | CCT |
| Line Stopping: Operation and Maintenance | LBGO 760 | Line Stopping Utilizing a Steel Wedge Stopper | LBGO |
| Line Stopping: Operation and Maintenance | LBGO 762 | Line Stopping Utilizing a Hot Tap Fitting (2'' & greater) | LBGO |
| Line Stopping: Operation and Maintenance | FCG 001SUBB OP | Pipeline Shutdown by Use of Stopping Equipment | CCT |
| Line Stopping: Operation and Maintenance | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Line Stopping: Operation and Maintenance | FCG 001SUBB | Pipeline Shutdown by Use of Stopping Equipment | FCG |
| Line Stopping: Operation and Maintenance | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Line Stopping: Operation and Maintenance | SPL 4062 | Perform Line Stop Utilizing a Hot Tap Fitting | SIN |
| Locate Line and Place/Maintain Line Markers | 605 | Locate Line/Install Temporary Marking of Buried Pipeline | CCT |
| Locate Line and Place/Maintain Line Markers | 703 | Placing/Maintaining Line Markers | CCT |
| Locate Line and Place/Maintain Line Markers | OQ-1291 | Task 1291 Locate Underground Pipelines | DOM |
| Locate Line and Place/Maintain Line Markers | OQ-1291 | Task 1291 Locate Underground Pipelines | DOMHOPE |
| Locate Line and Place/Maintain Line Markers | OQ-1301 | Task 1301 Install and Maintain Pipeline Markers | DOM |
| Locate Line and Place/Maintain Line Markers | OQ-1301 | Task 1301 Install and Maintain Pipeline Markers | DOMHOPE |
| Locate Line and Place/Maintain Line Markers | SCE029 | Maintain Right Of Way Mile Post Markers/Pipeline Markers /Vents | SCE |
| Locate Line and Place/Maintain Line Markers | SCE029OP | Maintain Right Of Way Mile Post Markers/Pipeline Markers /Vents | CCT |
| Locate Line and Place/Maintain Line Markers | SCE031 | Identify/Locate/Mark Pipelines | SCE |
| Locate Line and Place/Maintain Line Markers | SCE031OP | Identify/Locate/Mark Pipelines | CCT |
| Locate Line and Place/Maintain Line Markers | TC-605-I | Locate Line/Install Temporary Marking of Buried Pipeline (Inspection Only) | TC |
| Locate Line and Place/Maintain Line Markers | 617 | Locate Buried Facilities with an Electro-magnetic Device | CCT |
| Locate Line and Place/Maintain Line Markers | 618 | Install Temporary Marking of Buried Pipeline | CCT |
| Locate Line and Place/Maintain Line Markers | OPNSA-i605 | Locate Line/Install Temporary Marking of Buried Pipeline (Inspection only) | OPNA |
| Locate Line and Place/Maintain Line Markers | OPNSA-i605OP | Locate Line/Install Temporary Marking of Buried Pipeline (Inspection only) | CCT |
| Locate Line and Place/Maintain Line Markers | BHP - i605 | Locate Line/Install Temporary Marking of Buried Pipeline (Inspection only) | BHPFPU |
| Locate Line and Place/Maintain Line Markers | CM 605(a)OP | Locate Line/Install Temporary Marking of Buried Pipeline | CCT |
| Locate Line and Place/Maintain Line Markers | CM 703OP | Placing/Maintaining Line Markers | CCT |
| Locate Line and Place/Maintain Line Markers | 911 | Depth of Cover Verification | CCT |
| Locate Line and Place/Maintain Line Markers | MW-618i | Install Temporary Marking of Buried Pipeline | MWE |
| Locate Line and Place/Maintain Line Markers | VM-703OP | Placing/Maintaining Line Markers | CCT |
| Locate Line and Place/Maintain Line Markers | FCG 023A OP | Installation and maintenance of line markers | CCT |
| Locate Line and Place/Maintain Line Markers | FCG 044AA OP | Pipe locating and marking All Conventional Equipment | CCT |
| Locate Line and Place/Maintain Line Markers | FCG 044L OP | Pipe locating and marking (Generic GPR) | CCT |
| Locate Line and Place/Maintain Line Markers | FCG 044M OP | Pipe locating and marking (Gas Tracker) | CCT |
| Locate Line and Place/Maintain Line Markers | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Locate Line and Place/Maintain Line Markers | FCG 023A | Installation and maintenance of line markers | FCG |
| Locate Line and Place/Maintain Line Markers | FCG 044AA | Pipe locating and marking All Conventional Equipment | FCG |
| Locate Line and Place/Maintain Line Markers | FCG 044L | Pipe locating and marking (Generic GPR) | FCG |
| Locate Line and Place/Maintain Line Markers | FCG 044M | Pipe locating and marking (Gas Tracker) | FCG |
| Locate Line and Place/Maintain Line Markers | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Locate Line and Place/Maintain Line Markers | CC-901OP | Locate and Mark Pipeline / Maintain Markers (Temporary) | CCT |
| Locate Line and Place/Maintain Line Markers | PAA - 14.1 - 14.5 | Locate Line and Install, Inspect, and Maintain Permanent and Temporary Markers | CCT |
| Locate Line and Place/Maintain Line Markers (Submerged) | 604 | Locate, Mark, and Remediate Exposed Pipelines in the Gulf of Mexico | CCT |
| Locate Line and Place/Maintain Line Markers (Submerged) | 606 | Locate and Mark Submerged Pipelines | CCT |
| Locate Line and Place/Maintain Line Markers (Submerged) | SCE047 | Locate/Mark Submerged Pipelines | SCE |
| Locate Line and Place/Maintain Line Markers (Submerged) | SCE047OP | Locate/Mark Submerged Pipelines | CCT |
| Mapping/Surveying | 909 | Data Collection for As-Built Pipe Location Documentation | CCT |
| Mapping/Surveying | CHK-909i | Data Collection for As-Built Pipe Location Documentation (Inspection only) | CEC |
| Mapping/Surveying | CHK-909 | Data Collection for As-Built Pipe Location Documentation | CEC |
| Mapping/Surveying | MW-909i | Data Collection for As-Built Pipe Location Documentation (Inspection Only) | MWE |
| Measures to Protect the Public | SCE033 | Investigate Leaks/Damage and Report Problems | SCE |
| Measures to Protect the Public | SCE033OP | Investigate Leaks/Damage and Report Problems | CCT |
| Measures to Protect the Public | SCE096 | Recognize Abnormal Operating Conditions & initiate Location Response | SCE |
| Measures to Protect the Public | SCE096OP | Recognize Abnormal Operating Conditions & initiate Location Response | CCT |
| Measures to Protect the Public | SCE097 | Respond to Alarms | SCE |
| Measures to Protect the Public | SCE097OP | Respond to Alarms | CCT |
| Miscellaneous: Liquid Knock-Out Equipment Operation/Maintenance | SCE071 | Operate/Maintain Liquid Knock-Out | SCE |
| Miscellaneous: Liquid Knock-Out Equipment Operation/Maintenance | SCE071OP | Operate/Maintain Liquid Knock-Out | CCT |
| Miscellaneous: Stress Relief | SCE058 | Perform/Direct Stress Refief | SCE |
| Miscellaneous: Stress Relief | SCE058OP | Perform/Direct Stress Refief | CCT |
| Monitor Pressure | 602 | Monitoring Pipeline Pressure | CCT |
| Monitor Pressure | SCE095 | Monitor Pressure & Prevent MAOP and/or MOP Violations | SCE |
| Monitor Pressure | SCE095OP | Monitor Pressure & Prevent MAOP and/or MOP Violations | CCT |
| Monitor Pressure | AXL-602OP | Monitoring Pipeline Pressure | CCT |
| Monitor Pressure | MW-602i | Monitoring Pipeline Pressure (Inspection) | MWE |
| Monitor Pressure | VM-602OP | Monitoring Pipeline Pressure | CCT |
| Monitor Pressure | CC-304OP | Monitoring Pipeline Pressure | CCT |
| Monitor Pressure | CM 602OP | Monitoring Pipeline Pressure | CCT |
| Movement of In-Service Pipeline | 009 | Movement and/or Relocation of Liquid Pipelines | CCT |
| Movement of In-Service Pipeline | CM 009OP | Movement and/or Relocation of Liquid Pipelines | CCT |
| Non-Destructive Testing | 204 | Non-Destructive Testing (Dye Penetrant) | CCT |
| Non-Destructive Testing | 205 | Non-Destructive Testing (Mag Particle) | CCT |
| Non-Destructive Testing | 206 | Non-Destructive Testing (Ultrasonic) | CCT |
| Non-Destructive Testing | 207 | Non-Destructive Testing (X-Ray) | CCT |
| Non-Destructive Testing | 008 | Measurement of Wall Thickness with Ultrasonic Device | CCT |
| Non-Destructive Testing | 103 | Non-destructive Testing (Other than testing of welds) -- Mag Particle | CCT |
| Non-Destructive Testing | OQ-0601 | Task 0601 NDT - Radiographic Testing | DOM |
| Non-Destructive Testing | OQ-0601 | Task 0601 NDT - Radiographic Testing | DOMHOPE |
| Non-Destructive Testing | OQ-0611 | Task 0611 NDT - Liquid Penetrant Testing | DOM |
| Non-Destructive Testing | OQ-0611 | Task 0611 NDT - Liquid Penetrant Testing | DOMHOPE |
| Non-Destructive Testing | OQ-0621 | Task 0621 NDT - Magnetic Particle Testing | DOM |
| Non-Destructive Testing | OQ-0621 | Task 0621 NDT - Magnetic Particle Testing | DOMHOPE |
| Non-Destructive Testing | OQ-0631 | Task 0631 NDT - Ultrasonic Testing | DOM |
| Non-Destructive Testing | OQ-0631 | Task 0631 NDT - Ultrasonic Testing | DOMHOPE |
| Non-Destructive Testing | SCE075 | Perform Radiographic Testing | SCE |
| Non-Destructive Testing | SCE075OP | Perform Radiographic Testing | CCT |
| Non-Destructive Testing | SCE076 | Perform Advanced Magnetic Particle Testing | SCE |
| Non-Destructive Testing | SCE076OP | Perform Advanced Magnetic Particle Testing | CCT |
| Non-Destructive Testing | SCE077 | Perform Advanced Liquid Penetrant Testing | SCE |
| Non-Destructive Testing | SCE077OP | Perform Advanced Liquid Penetrant Testing | CCT |
| Non-Destructive Testing | SCE078 | Perform Advanced Ultrasonic Testing | SCE |
| Non-Destructive Testing | SCE078OP | Perform Advanced Ultrasonic Testing | CCT |
| Non-Destructive Testing | SCE079 | Perform Advanced Eddy Current Testing | SCE |
| Non-Destructive Testing | SCE079OP | Perform Advanced Eddy Current Testing | CCT |
| Non-Destructive Testing | SCE081 | Perform Limited Ultrasonic Testing | SCE |
| Non-Destructive Testing | SCE081OP | Perform Limited Ultrasonic Testing | CCT |
| Non-Destructive Testing | SCE082 | Perform Limited Magnetic Particle Testing | SCE |
| Non-Destructive Testing | SCE082OP | Perform Limited Magnetic Particle Testing | CCT |
| Non-Destructive Testing | SCE083 | Perform Limited Liquid Penetrant Testing | SCE |
| Non-Destructive Testing | SCE083OP | Perform Limited Liquid Penetrant Testing | CCT |
| Non-Destructive Testing | SCE084 | Inspect/Measure/Evaluate Mechanical Damage in Pipelines | SCE |
| Non-Destructive Testing | SCE084OP | Inspect/Measure/Evaluate Mechanical Damage in Pipelines | CCT |
| Non-Destructive Testing | SPL 3820 | Non-Destructive Testing of Welds (X-Ray) | SIN |
| Non-Destructive Testing | SPL 3860 | Non-Destructive Testing of Welds (Mag Particle) | SIN |
| Non-Destructive Testing | SPL 3870 | Non-Destructive Testing of Welds (Ultrasonic) | SIN |
| Non-Destructive Testing | SPL 3850 | Non-Destructive Testing of Welds (Dye Penetrant) | SIN |
| Non-Destructive Testing | 104 | Non-destructive Testing (Other than testing of welds) - Dye Penetrant Inspection (DPI) | CCT |
| Non-Destructive Testing | CM 103OP | Nondestructive Testing (Other than testing of welds) - Mag Particle | CCT |
| Non-Destructive Testing | FCG 037A OP | Nondestructive testing of welds | CCT |
| Non-Destructive Testing | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Non-Destructive Testing | FCG 037A | Nondestructive testing of welds | FCG |
| Non-Destructive Testing | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Non-Destructive Testing | EMP-31 | Vision Test | CCT |
| Non-Destructive Testing | EMP-204 | Non-Destructive Testing (Dye Penetrant (Limited)) | CCT |
| Non-Destructive Testing | EMP-205 | Non-Destructive Testing (Mag Particle (Limited)) | CCT |
| Non-Destructive Testing | EMP-206 | Non-Destructive Testing (Ultrasonic (Limited)) | CCT |
| Odorization | 609 | Inspect and Maintain Odorization Equipment | CCT |
| Odorization | 610 | Monitor Odorant Concentration | CCT |
| Odorization | OQ-1211 | Task 1211 Odorization - Periodic Sampling | DOM |
| Odorization | OQ-1211 | Task 1211 Odorization - Periodic Sampling | DOMHOPE |
| Odorization | OQ-1221 | Task 1221 Odorization - Odorizer Inspection, Testing, Preventive and Corrective Maintenance | DOM |
| Odorization | OQ-1221 | Task 1221 Odorization - Odorizer Inspection, Testing, Preventive and Corrective Maintenance | DOMHOPE |
| Odorization | SCE049 | Operate/Inspect/Maintain Odorant System | SCE |
| Odorization | SCE049OP | Operate/Inspect/Maintain Odorant System | CCT |
| Odorization | SCE051 | Perform Odorant Tests | SCE |
| Odorization | SCE051OP | Perform Odorant Tests | CCT |
| Odorization | FCG 041A OP | Odorant Sampling Odorator | CCT |
| Odorization | FCG 041B OP | Odorant Sampling Odorometer | CCT |
| Odorization | FCG 041C OP | Odorant Sampling DETEX DX 1000GL | CCT |
| Odorization | FCG 041D OP | Odorant Sampling Medium BTU Landfill Gas Pipeline | CCT |
| Odorization | FCG 057A OP | Odorization | CCT |
| Odorization | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Odorization | FCG 041A | Odorant Sampling Odorator | FCG |
| Odorization | FCG 041B | Odorant Sampling Odorometer | FCG |
| Odorization | FCG 041C | Odorant Sampling DETEX DX 1000GL | FCG |
| Odorization | FCG 041D | Odorant Sampling Medium BTU Landfill Gas Pipeline | FCG |
| Odorization | FCG 057A | Odorization | FCG |
| Odorization | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Overfill Protective Devices: Inspection/Calibration/Repair | 003 | Test Breakout Tank Overfill Protective Devices | CCT |
| Overfill Protective Devices: Inspection/Calibration/Repair | 004 | Inspect and Calibrate Breakout Tank Overfill Protective Devices | CCT |
| Overfill Protective Devices: Inspection/Calibration/Repair | 005 | Repair Breakout Tank Overfill Protective Devices | CCT |
| Overfill Protective Devices: Inspection/Calibration/Repair | SCE086 | Inspect/Calibrate/Repair Overfill Protective Devices | SCE |
| Overfill Protective Devices: Inspection/Calibration/Repair | SCE086OP | Inspect/Calibrate/Repair Overfill Protective Devices | CCT |
| Overfill Protective Devices: Inspection/Calibration/Repair | VM-004OP | Inspect and Calibrate Breakout Tank Overfill Protective Devices | CCT |
| Overfill Protective Devices: Inspection/Calibration/Repair | CM 004OP | Inspect and Test Breakout Tank Overfill Protective Devices | CCT |
| Patrolling Pipeline | 701 | Patrolling Pipeline and Leakage Survey without Instrument | CCT |
| Patrolling Pipeline | OQ-1261 | Task 1261 Walking Gas Leakage Survey | DOM |
| Patrolling Pipeline | OQ-1261 | Task 1261 Walking Gas Leakage Survey | DOMHOPE |
| Patrolling Pipeline | OQ-1311 | Task 1311 Inspect Pipeline Surface Conditions - Patrol Right Of Way or Easement | DOM |
| Patrolling Pipeline | OQ-1311 | Task 1311 Inspect Pipeline Surface Conditions - Patrol Right Of Way or Easement | DOMHOPE |
| Patrolling Pipeline | SCE030 | Perform/Observe Ground Leak Survey/Patrol | SCE |
| Patrolling Pipeline | SCE030OP | Perform/Observe Ground Leak Survey/Patrol | CCT |
| Patrolling Pipeline | SCE038 | Manage/Monitor Encroachment or Excavation | SCE |
| Patrolling Pipeline | SCE038OP | Manage/Monitor Encroachment or Excavation | CCT |
| Patrolling Pipeline | SCE041 | Perform Aerial Leak Survery/Patrol | SCE |
| Patrolling Pipeline | SCE041OP | Perform Aerial Leak Survery/Patrol | CCT |
| Patrolling Pipeline | CM 701OP | Patrolling Pipeline and Leakage Survey without Instrument | CCT |
| Patrolling Pipeline | VM-701OP | Patrolling Pipeline and Leakage Survey without Instrument | CCT |
| Patrolling Pipeline | FCG 043A OP | Patrolling pipelines | CCT |
| Patrolling Pipeline | FCG 043B OP | Patrolling pipelines Aerial | CCT |
| Patrolling Pipeline | FCG 043C OP | Patrolling pipelines (Under Water) | CCT |
| Patrolling Pipeline | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Patrolling Pipeline | FCG 043A | Patrolling pipelines | FCG |
| Patrolling Pipeline | FCG 043B | Patrolling pipelines Aerial | FCG |
| Patrolling Pipeline | FCG 043C | Patrolling pipelines (Under Water) | FCG |
| Patrolling Pipeline | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Patrolling Pipeline | CC-208OP | Inspect Pipeline ROW Ground Patrol | CCT |
| Permanent Field Repair: Bolt-on Clamp/Sleeve | 707 | Permanent Field Repair Using Bolt-On Clamp/Sleeve | CCT |
| Permanent Field Repair: Bolt-on Clamp/Sleeve | OQ-1041 | Task 1041 Install Mechanical Clamps and Sleeves - Bolted | DOM |
| Permanent Field Repair: Bolt-on Clamp/Sleeve | OQ-1041 | Task 1041 Install Mechanical Clamps and Sleeves - Bolted | DOMHOPE |
| Permanent Field Repair: Bolt-on Clamp/Sleeve | SCE035 | Install Mechanical Bolt-On Clamps | SCE |
| Permanent Field Repair: Bolt-on Clamp/Sleeve | SCE035OP | Install Mechanical Bolt-On Clamps | CCT |
| Permanent Field Repair: Bolt-on Clamp/Sleeve | LBGO 707OP | Permanent Field Repair Using Bolt-On Clamp | CCT |
| Permanent Field Repair: Bolt-on Clamp/Sleeve | CM 707OP | Field Repair Using Plidco Split+Sleeve | CCT |
| Permanent Field Repair: Composite Materials | 705 | Permanent Field Repair Using Composite Materials (Clockspring) | CCT |
| Permanent Field Repair: Composite Materials | 706 | Permanent Field Repair Using Composite Materials (Armor Plate) | CCT |
| Permanent Field Repair: Composite Materials | 719 | Permanent Field Repair Using Composite Materials (Wrapmaster) | CCT |
| Permanent Field Repair: Composite Materials | 721 | Permanent Field Repair Using Composite Materials (Black Diamond) | CCT |
| Permanent Field Repair: Composite Materials | 722 | Permanent Field Repair Using Composite Materials (Aqua Wrap) | CCT |
| Permanent Field Repair: Composite Materials | 724 | Permanent Field Repair Using Composite Materials (PipeWrap A+ / Atlas CFP) | CCT |
| Permanent Field Repair: Composite Materials | OQ-1061 | Task 1061 Install Composite Sleeves - Shrink Sleeve, | DOM |
| Permanent Field Repair: Composite Materials | OQ-1061 | Task 1061 Install Composite Sleeves - Shrink Sleeve, | DOMHOPE |
| Permanent Field Repair: Composite Materials | OQ-1062 | Task 1062 Install Composite Sleeves - Composite Patch, | DOM |
| Permanent Field Repair: Composite Materials | OQ-1062 | Task 1062 Install Composite Sleeves - Composite Patch, | DOMHOPE |
| Permanent Field Repair: Composite Materials | OQ-1063 | Task 1063 Install Composite Sleeves - Composite Patch, | DOM |
| Permanent Field Repair: Composite Materials | OQ-1063 | Task 1063 Install Composite Sleeves - Composite Patch, | DOMHOPE |
| Permanent Field Repair: Composite Materials | OQ-1064 | Task 1064 Install Composite Sleeve - Clock Spring | DOM |
| Permanent Field Repair: Composite Materials | OQ-1064 | Task 1064 Install Composite Sleeve - Clock Spring | DOMHOPE |
| Permanent Field Repair: Composite Materials | SCE037 | Install Composite Repair Sleeve | SCE |
| Permanent Field Repair: Composite Materials | SCE037OP | Install Composite Repair Sleeve | CCT |
| Permanent Field Repair: Composite Materials | 730 | Permanent Field Repair Using Composite Materials (XHab) | CCT |
| Permanent Field Repair: Composite Materials | 731 | Permanent Field Repair Using Composite Materials (NRI) | CCT |
| Permanent Field Repair: Composite Materials | 732 | Permanent Field Repair Using Composite Materials (RES-Q Composite Wrap - TDW) | CCT |
| Permanent Field Repair: Composite Materials | 734 | Permanent Field Repair Using Composite Materials (I-Wrap aka HydraWrap Composite Wrap Systems) | CCT |
| Permanent Field Repair: Composite Materials | BWP9024 | Permanent Field Repair Using Composite Materials (Composi-Sleeve) | BWP |
| Permanent Field Repair: Composite Materials | 733 | Permanent Field Repair Using Composite Materials (Composi-Sleeve) | CCT |
| Permanent Field Repair: Composite Materials | 735 | Permanent Field Repair Using Composite Materials (UltraWrap) | CCT |
| Permanent Field Repair: Composite Materials | PXA 724 | Permanent Field Repair Using Composite Materials (PipeWrap A+ / Atlas CFP & FormaShield) | PRAX |
| Permanent Field Repair: Composite Materials | PXA 724OP | Permanent Field Repair Using Composite Materials (PipeWrap A+ / Atlas CFP & FormaShield) | CCT |
| Permanent Field Repair: Composite Materials | PAA-40.3 | Apply Composite Sleeve | CCT |
| Permanent Field Repair: Composite Materials | FCG 008C OP | inspection and application of coating Composite Wrap (Res-Q Composite Wrap) | CCT |
| Permanent Field Repair: Composite Materials | FCG 008EOP | Inspection and Application of Composite Wrap (Clock Spring Composite Wrap) | CCT |
| Permanent Field Repair: Composite Materials | FCG 008F OP | Inspection and Application of Composite Wrap (Clock Spring Contour Composite Wrap) | CCT |
| Permanent Field Repair: Composite Materials | FCG 008G OP | Inspection and Application of Composite Wrap (Black Diamond Composite Wrap) | CCT |
| Permanent Field Repair: Composite Materials | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Permanent Field Repair: Composite Materials | FCG 008C | inspection and application of coating Composite Wrap (Res-Q Composite Wrap) | FCG |
| Permanent Field Repair: Composite Materials | FCG 008E | Inspection and Application of Composite Wrap (Clock Spring Composite Wrap) | FCG |
| Permanent Field Repair: Composite Materials | FCG 008F | Inspection and Application of Composite Wrap (Clock Spring Contour Composite Wrap) | FCG |
| Permanent Field Repair: Composite Materials | FCG 008G | Inspection and Application of Composite Wrap (Black Diamond Composite Wrap) | FCG |
| Permanent Field Repair: Composite Materials | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Permanent Field Repair: Composite Materials | ENB 705 | Permanent Field Repair Using Composite Materials (Clockspring) | SET |
| Permanent Field Repair: Composite Materials | KP 700 | Permanent Field Repair Using Composite Materials (Belzona) | KIN |
| Permanent Field Repair: Composite Materials | KP 700OP | Permanent Field Repair Using Composite Materials (Belzona) | CCT |
| Permanent Field Repair: Composite Materials | 705ENB | Permanent Field Repair Using Composite Materials (Clockspring) | CCT |
| Permanent Field Repair: Full Encirclement Weld Sleeve | 708 | Permanent Field Repair Using Full Encirclement Weld Sleeve | CCT |
| Permanent Field Repair: Full Encirclement Weld Sleeve | OQ-1051 | Task 1051 Fit-up of Weld Type Repair Sleeve | DOM |
| Permanent Field Repair: Full Encirclement Weld Sleeve | OQ-1051 | Task 1051 Fit-up of Weld Type Repair Sleeve | DOMHOPE |
| Permanent Field Repair: Full Encirclement Weld Sleeve | SCE036 | Prepare Line for Installation of Full-Encirclement Weld Sleeve | SCE |
| Permanent Field Repair: Full Encirclement Weld Sleeve | SCE036OP | Prepare Line for Installation of Full-Encirclement Weld Sleeve | CCT |
| Permanent Field Repair: Full Encirclement Weld Sleeve | CM 708OP | Permanent Field Repair Using Full Encirclement Weld Sleeve | CCT |
| Permanent Field Repair: Grinding | 704 | Permanent Field Repair by Grinding | CCT |
| Permanent Field Repair: Grinding | OQ-1071 | Task 1071 Repair of Steel Pipe by Grinding | DOM |
| Permanent Field Repair: Grinding | OQ-1071 | Task 1071 Repair of Steel Pipe by Grinding | DOMHOPE |
| Permanent Field Repair: Grinding | CHK-704i | Permanent Field Repair by Grinding (Inspection only) | CEC |
| Permanent Field Repair: Grinding | OPNSA-i704 | Permanent Field Repair by Grinding (Inspection only) | OPNA |
| Permanent Field Repair: Grinding | OPNSA-i704OP | Permanent Field Repair by Grinding (Inspection only) | CCT |
| Permanent Field Repair: Grinding | CM 704OP | Field Repair by Grinding | CCT |
| Pigging Operations | SCE032 | Launch/Monitor/Receive/Maintain Pig | SCE |
| Pigging Operations | SCE032OP | Launch/Monitor/Receive/Maintain Pig | CCT |
| Pigging Operations | TC-723 | Conduct Pipeline Pigging | TC |
| Pigging Operations | CHK-1641 | Pig Launching & Receiving | CCT |
| Pigging Operations | CHK-1641-V | Pig Launching & Receiving | CEC |
| Pigging Operations | 661 | Launching and/or Receiving Internal Devices (Pigs) | CCT |
| Pigging Operations | CM 661OP | Launching and/or Receiving Internal Devices (Pigs) for Lines in service | CCT |
| Pigging Operations | OPNSA-i661 | Launching and/or Receiving Internal Devices (Pigs) for Lines in service (Inspection) | OPNA |
| Pigging Operations | VM-661OP | Launching and/or Receiving Internal Devices (Pigs) for Lines in service | CCT |
| Pigging Operations | CC-401OP | Launching/ Receiving In-line Inspection Devices | CCT |
| Pipeline: Start-up/Shut-down to Assure Operation Within MAOP/MOP | 601 | Start-up/Shut-down of Pipeline to Assure Operation Within MAOP / MOP | CCT |
| Pipeline: Start-up/Shut-down to Assure Operation Within MAOP/MOP | SCE045 | Startup and Shutdown of Pipeline | SCE |
| Pipeline: Start-up/Shut-down to Assure Operation Within MAOP/MOP | SCE045OP | Startup and Shutdown of Pipeline | CCT |
| Pipeline: Start-up/Shut-down to Assure Operation Within MAOP/MOP | 021 | Start-up/Shutdown of Liquid Pipeline to Assure Operation within MOP | CCT |
| Pipeline: Start-up/Shut-down to Assure Operation Within MAOP/MOP | LBGO 601 | Start-up/Shut-down of Pipeline to Assure Operation within MAOP/MOP | LBGO |
| Pipeline: Start-up/Shut-down to Assure Operation Within MAOP/MOP | VM-601OP | Start-up/Shut-down of Pipeline to Assure Operation Within MOP | CCT |
| Pipeline: Start-up/Shut-down to Assure Operation Within MAOP/MOP | CC-302OP | Start-up / Shutdown of Liquid Pipeline to Assure Operation within MOP | CCT |
| Plastic Pipe: Fusion/Joining | 208 | Plastic Pipe Joining: Butt Fusion | CCT |
| Plastic Pipe: Fusion/Joining | 209 | Plastic Pipe Joining: Mechanical Joining | CCT |
| Plastic Pipe: Fusion/Joining | 210 | Plastic Pipe Joining: Electrofusion Joining | CCT |
| Plastic Pipe: Fusion/Joining | 211 | Perform Plastic Fusion Inspection | CCT |
| Plastic Pipe: Fusion/Joining | OQ-0751 | Task 0751 Joining of Plastic Pipe - Butt Heat-Fusion: Manual | DOM |
| Plastic Pipe: Fusion/Joining | OQ-0751 | Task 0751 Joining of Plastic Pipe - Butt Heat-Fusion: Manual | DOMHOPE |
| Plastic Pipe: Fusion/Joining | OQ-0761 | Task 0761 Joining of Plastic Pipe - Butt Heat-Fusion: Hydraulic Machine | DOM |
| Plastic Pipe: Fusion/Joining | OQ-0761 | Task 0761 Joining of Plastic Pipe - Butt Heat-Fusion: Hydraulic Machine | DOMHOPE |
| Plastic Pipe: Fusion/Joining | OQ-0781 | Task 0781 Joining of Plastic Pipe - Electrofusion | DOM |
| Plastic Pipe: Fusion/Joining | OQ-0781 | Task 0781 Joining of Plastic Pipe - Electrofusion | DOMHOPE |
| Plastic Pipe: Fusion/Joining | 218 | Plastic Pipe Joining: Solvent Cement | CCT |
| Plastic Pipe: Fusion/Joining | 219 | Plastic Pipe Joining: Stab Fittings | CCT |
| Plastic Pipe: Fusion/Joining | OPNSA-i208 | Plastic Pipe Joining: Butt Fusion (Inspection Only) | OPNA |
| Plastic Pipe: Fusion/Joining | OPNSA-i208OP | Plastic Pipe Joining: Butt Fusion (Inspection Only) | CCT |
| Plastic Pipe: Fusion/Joining | BWP9026 | Perform Plastic Fusion Inspection | BWP |
| Plastic Pipe: Fusion/Joining | 9026 | Perform Plastic Fusion Inspection | CCT |
| Plastic Pipe: Fusion/Joining | CUC 220 | Plastic Pipe Joining: Sidewall Heat Fusion | CHUT |
| Plastic Pipe: Fusion/Joining | CUC 220OP | Plastic Pipe Joining: Sidewall Heat Fusion | CCT |
| Plastic Pipe: Fusion/Joining | CUC 221 | Plastic Pipe Joining: Socket Heat Fusion | CHUT |
| Plastic Pipe: Fusion/Joining | CUC 221OP | Plastic Pipe Joining: Socket Heat Fusion | CCT |
| Plastic Pipe: Fusion/Joining | LBGO 208OP | Plastic Pipe Joining: Butt Fusion | CCT |
| Plastic Pipe: Fusion/Joining | LBGO 210OP | Plastic Pipe Joining: Electrofusion Joining | CCT |
| Plastic Pipe: Fusion/Joining | OKE 223 | Plastic Pipe Joining: Sidewall Heat Fusion (G0771) | ONEOK |
| Plastic Pipe: Fusion/Joining | OKE 224 | Plastic Pipe Fusion: Socket Heat Fusion (G0791) | ONEOK |
| Plastic Pipe: Fusion/Joining | FPU 0771 | Joining of Pipe: Sidewall Heat Fusion | FPU |
| Plastic Pipe: Fusion/Joining | FPU 0771OP | Joining of Pipe: Sidewall Heat Fusion | CCT |
| Plastic Pipe: Fusion/Joining | FPU 0791 | Joining of Pipe: Socket Heat Fusion | FPU |
| Plastic Pipe: Fusion/Joining | FPU 0791OP | Joining of Pipe: Socket Heat Fusion | CCT |
| Plastic Pipe: Fusion/Joining | LBGO 208 | Plastic Pipe Joining: Butt Fusion | LBGO |
| Plastic Pipe: Fusion/Joining | LBGO 210 | Plastic Pipe Joining: Electrofusion Joining | LBGO |
| Plastic Pipe: Fusion/Joining | FCG 030A OP | Joining plastic and Steel Pipe by Mechanical Means | CCT |
| Plastic Pipe: Fusion/Joining | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Plastic Pipe: Fusion/Joining | FCG 030A | Joining plastic and Steel Pipe by Mechanical Means | FCG |
| Plastic Pipe: Fusion/Joining | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Plastic Pipe: Fusion/Joining | FCG JQ-MECH-CRIMP-04 | Mechanical Joining Crimp Type Fitting 4 in | FCG |
| Plastic Pipe: Fusion/Joining | FCG JQ-MECH-CRIMP-08 | Mechanical Joining Crimp Type Fitting 8 in | FCG |
| Plastic Pipe: Fusion/Joining | FCG JQ-MECH-SADDLE-04 | Mechanical Joining Mechanical Saddle 4 in | FCG |
| Plastic Pipe: Fusion/Joining | FCG JQ-MECH-SADDLE-08 | Mechanical Joining Mechanical Saddle 8 in | FCG |
| Plastic Pipe: Fusion/Joining | FCG JQ-PLS-BUTT-01 | Plastic Fusion Butt 1 | FCG |
| Plastic Pipe: Fusion/Joining | FCG JQ-PLS-BUTT-02 | Plastic Fusion Butt 2 | FCG |
| Plastic Pipe: Fusion/Joining | FCG JQ-PLS-BUTT-04 | Plastic Fusion Butt 4 | FCG |
| Plastic Pipe: Fusion/Joining | FCG JQ-PLS-BUTT-06 | Plastic Fusion Butt 6 | FCG |
| Plastic Pipe: Fusion/Joining | FCG JQ-PLS-BUTT-08 | Plastic Fusion Butt 8 | FCG |
| Plastic Pipe: Fusion/Joining | FCG JQ-PLS-BUTT-12 | Plastic Fusion Butt 12 | FCG |
| Plastic Pipe: Fusion/Joining | FCG JQ-PLS-EFUSE-04 | Plastic Fusion Electrofusion Coupling 4 | FCG |
| Plastic Pipe: Fusion/Joining | FCG JQ-PLS-EFUSE-06 | Plastic Fusion Electrofusion Coupling 6 | FCG |
| Plastic Pipe: Fusion/Joining | FCG JQ-PLS-EFUSE-08 | Plastic Fusion Electrofusion Coupling 8 | FCG |
| Plastic Pipe: Fusion/Joining | FCG JQ-PLS-EFUSE-12 | Plastic Fusion Electrofusion Coupling 12 | FCG |
| Plastic Pipe: Fusion/Joining | FCG JQ-PLS-SDL-02 | Plastic Fusion Saddle 2 | FCG |
| Plastic Pipe: Fusion/Joining | FCG JQ-PLS-SDL-04 | Plastic Fusion Saddle 4 | FCG |
| Plastic Pipe: Fusion/Joining | FCG JQ-PLS-SDL-06 | Plastic Fusion Saddle 6 | FCG |
| Plastic Pipe: Fusion/Joining | FCG JQ-PLS-SDL-08 | Plastic Fusion Saddle 8 | FCG |
| Plastic Pipe: Fusion/Joining | FCG JQ-PLS-SOCKET-02 | Plastic Fusion Socket 2 | FCG |
| Plastic Pipe: Fusion/Joining | FCG JQ-PLS-SOCKET-04 | Plastic Fusion Socket 4 | FCG |
| Plastic Pipe: Fusion/Joining | FCG JQ-MECH-CRIMP-04 OP | Mechanical Joining Crimp Type Fitting 4 in | CCT |
| Plastic Pipe: Fusion/Joining | FCG JQ-MECH-CRIMP-08 OP | Mechanical Joining Crimp Type Fitting 8 in | CCT |
| Plastic Pipe: Fusion/Joining | FCG JQ-MECH-SADDLE-04 OP | Mechanical Joining Mechanical Saddle 4 in | CCT |
| Plastic Pipe: Fusion/Joining | FCG JQ-MECH-SADDLE-08 OP | Mechanical Joining Mechanical Saddle 8 in | CCT |
| Plastic Pipe: Fusion/Joining | FCG JQ-PLS-BUTT-01 OP | Plastic Fusion Butt 1 | CCT |
| Plastic Pipe: Fusion/Joining | FCG JQ-PLS-BUTT-02 OP | Plastic Fusion Butt 2 | CCT |
| Plastic Pipe: Fusion/Joining | FCG JQ-PLS-BUTT-04 OP | Plastic Fusion Butt 4 | CCT |
| Plastic Pipe: Fusion/Joining | FCG JQ-PLS-BUTT-06 OP | Plastic Fusion Butt 6 | CCT |
| Plastic Pipe: Fusion/Joining | FCG JQ-PLS-BUTT-08 OP | Plastic Fusion Butt 8 | CCT |
| Plastic Pipe: Fusion/Joining | FCG JQ-PLS-BUTT-12 OP | Plastic Fusion Butt 12 | CCT |
| Plastic Pipe: Fusion/Joining | FCG JQ-PLS-EFUSE-04 OP | Plastic Fusion Electrofusion Coupling 4 | CCT |
| Plastic Pipe: Fusion/Joining | FCG JQ-PLS-EFUSE-06 OP | Plastic Fusion Electrofusion Coupling 6 | CCT |
| Plastic Pipe: Fusion/Joining | FCG JQ-PLS-EFUSE-08 OP | Plastic Fusion Electrofusion Coupling 8 | CCT |
| Plastic Pipe: Fusion/Joining | FCG JQ-PLS-EFUSE-12 OP | Plastic Fusion Electrofusion Coupling 12 | CCT |
| Plastic Pipe: Fusion/Joining | FCG JQ-PLS-SDL-02 OP | Plastic Fusion Saddle 2 | CCT |
| Plastic Pipe: Fusion/Joining | FCG JQ-PLS-SDL-04 OP | Plastic Fusion Saddle 4 | CCT |
| Plastic Pipe: Fusion/Joining | FCG JQ-PLS-SDL-06 OP | Plastic Fusion Saddle 6 | CCT |
| Plastic Pipe: Fusion/Joining | FCG JQ-PLS-SDL-08 OP | Plastic Fusion Saddle 8 | CCT |
| Plastic Pipe: Fusion/Joining | FCG JQ-PLS-SOCKET-02 OP | Plastic Fusion Socket 2 | CCT |
| Plastic Pipe: Fusion/Joining | FCG JQ-PLS-SOCKET-04 OP | Plastic Fusion Socket 4 | CCT |
| Plastic Pipe: Fusion/Joining | FCG-JQ-PLS-EFUSE-SDL OP | Plastic Fusion Electrofusion Saddle Fitting | CCT |
| Plastic Pipe: Fusion/Joining | FCG-JQ-PLS-EFUSE-02 & Below OP | Plastic Fusion Electrofusion Coupling 2 & Below | CCT |
| Plastic Pipe: Fusion/Joining | FCG-JQ-MECH-CRIMP-02 & Below OP | Mechanical Joining Crimp Type Fitting 2 in & Below | CCT |
| Plastic Pipe: Fusion/Joining | FCG-JQ-MECH-SADDLE-02 & Below OP | Mechanical Joining Mechanical Saddle 2 in & Below | CCT |
| Plastic Pipe: Fusion/Joining | FCG-JQ-PLS-EFUSE-SDL | Plastic Fusion Electrofusion Saddle Fitting | FCG |
| Plastic Pipe: Fusion/Joining | FCG-JQ-PLS-EFUSE-02 & Below | Plastic Fusion Electrofusion Coupling 2 & Below | FCG |
| Plastic Pipe: Fusion/Joining | FCG-JQ-MECH-CRIMP-02 & Below | Mechanical Joining Crimp Type Fitting 2 in & Below | FCG |
| Plastic Pipe: Fusion/Joining | FCG-JQ-MECH-SADDLE-02 & Below | Mechanical Joining Mechanical Saddle 2 in & Below | FCG |
| Plastic Pipe: Installation | OQ-0901 | Task 0901 Installation of Plastic Pipe in a Ditch | DOM |
| Plastic Pipe: Installation | OQ-0901 | Task 0901 Installation of Plastic Pipe in a Ditch | DOMHOPE |
| Plastic Pipe: Installation | OQ-0941 | Task 0941 Install Tracer Wire | DOM |
| Plastic Pipe: Installation | OQ-0941 | Task 0941 Install Tracer Wire | DOMHOPE |
| Plastic Pipe: Installation | 301 | Install Tracer (electrically conductive) Wire | CCT |
| Plastic Pipe: Installation | 330 | Installation of Plastic Pipe in a Ditch | CCT |
| Plastic Pipe: Installation | 331 | Installation of Plastic Pipe in a Bore | CCT |
| Plastic Pipe: Installation | OPNSA-i301 | Install Tracer (Electrically Conductive) Wire (Inspection Only) | OPNA |
| Plastic Pipe: Installation | OPNSA-i301OP | Install Tracer (Electrically Conductive) Wire (Inspection Only) | CCT |
| Plastic Pipe: Installation | BHP - i330 | Installation of Plastic Pipe in a Ditch (Inspection Only) | BHPFPU |
| Plastic Pipe: Installation | BHP - i331 | Installation of Plastic Pipe in a Bore (Inspection Only) | BHPFPU |
| Plastic Pipe: Installation | LBGO 301OP | Install Tracer (electrically conductive) Wire | CCT |
| Plastic Pipe: Installation | LBGO 330OP | Installation of Plastic Pipe in a Ditch | CCT |
| Plastic Pipe: Installation | LBGO 331OP | Installation of Plastic Pipe in a Bore | CCT |
| Plastic Pipe: Installation | LBGO 301 | Install Tracer (electrically conductive) Wire | LBGO |
| Plastic Pipe: Installation | LBGO 330 | Installation of Plastic Pipe in a Ditch | LBGO |
| Plastic Pipe: Installation | LBGO 331 | Installation of Plastic Pipe in a Bore | LBGO |
| Plastic Pipe: Installation | BLK 333 | Installation of Plastic Pipe By Insertion | BCG |
| Plastic Pipe: Installation | FCG 025A OP | Installation of plastic pipe | CCT |
| Plastic Pipe: Installation | FCG 025A | Installation of plastic pipe | FCG |
| Plastic Pipe: Installation | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Plastic Pipe: Installation | 333 | Installation of Plastic Pipe By Insertion | CCT |
| Plastic Pipe: Installation (Boring/HDD) | OQ-0911 | Task 0911 Installation of Plastic Pipe in a Bore | DOM |
| Plastic Pipe: Installation (Boring/HDD) | OQ-0911 | Task 0911 Installation of Plastic Pipe in a Bore | DOMHOPE |
| Plastic Pipe: Installation (Boring/HDD) | FCG 025B OP | Installation of plastic pipe (Boring Process) | CCT |
| Plastic Pipe: Installation (Boring/HDD) | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Plastic Pipe: Installation (Boring/HDD) | FCG 025B | Installation of plastic pipe (Boring Process) | FCG |
| Plastic Pipe: Installation (Boring/HDD) | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Plastic Pipe: Installation (Plowing/Pulling/Planting) | OQ-0921 | Task 0921 Installation of Plastic Pipe Plowing/Pull-in | DOM |
| Plastic Pipe: Installation (Plowing/Pulling/Planting) | OQ-0921 | Task 0921 Installation of Plastic Pipe Plowing/Pull-in | DOMHOPE |
| Plastic Pipe: Installation (Plowing/Pulling/Planting) | OQ-0931 | Task 0931 Installation of Plastic Pipe Plowing/Planting | DOM |
| Plastic Pipe: Installation (Plowing/Pulling/Planting) | OQ-0931 | Task 0931 Installation of Plastic Pipe Plowing/Planting | DOMHOPE |
| Plastic Pipe: Installation (Plowing/Pulling/Planting) | 332 | Installation of Plastic Pipe By Plowing (Pull-in/Planting) | CCT |
| Plastic Pipe: Installation (Plowing/Pulling/Planting) | WMGLD 333 | Installation of Plastic Pipe By Insertion | CCT |
| Plastic Pipe: Squeeze-Off | OQ-1141 | Task 1141 Squeeze off Plastic Pipe | DOM |
| Plastic Pipe: Squeeze-Off | OQ-1141 | Task 1141 Squeeze off Plastic Pipe | DOMHOPE |
| Plastic Pipe: Squeeze-Off | 763 | Squeeze Off Plastic Pipe | CCT |
| Plastic Pipe: Squeeze-Off | 764 | Squeeze Off Steel Pipe | CCT |
| Plastic Pipe: Squeeze-Off | LBGO 763 | Squeeze Off Plastic Pipe | LBGO |
| Plastic Pipe: Squeeze-Off | FCG 001SUBA OP | Pipeline Shutdown, Plastic and Steel Pipe by Use of Squeezers | CCT |
| Plastic Pipe: Squeeze-Off | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Plastic Pipe: Squeeze-Off | FCG 001SUBA | Pipeline Shutdown, Plastic and Steel Pipe by Use of Squeezers | FCG |
| Plastic Pipe: Squeeze-Off | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| PLCs/Instrument Controls | 711 | Inspect, Test, and Maintain Control Systems | CCT |
| PLCs/Instrument Controls | 712 | Programmable Logic Controllers | CCT |
| PLCs/Instrument Controls | 9004 | Programmable Logic Controllers - Allen Bradley | CCT |
| PLCs/Instrument Controls | 9005 | Inspect, Test, and Maintain Control Systems - Allen Bradley | CCT |
| PLCs/Instrument Controls | KRGT-0012OP | Inspect, Test, and Maintain Control Systems | CCT |
| PLCs/Instrument Controls | KRGT-0013OP | Basic Programmable Logic Controllers | CCT |
| PLCs/Instrument Controls | VM-711OP | Inspect, Test, and Maintain Control Systems | CCT |
| PLCs/Instrument Controls | VM-712OP | Programmable Logic Controllers | CCT |
| PLCs/Instrument Controls | 9031 | Programmable Logic Controllers (MR/CS) - Omni Flow Computer | CCT |
| PLCs/Instrument Controls | BWP9031 | Programmable Logic Controllers (MR/CS) - Omni Flow Computer | BWP |
| PLCs/Instrument Controls | 9032 | Inspect, Test and Maintain Control Systems Omni 6000 | CCT |
| PLCs/Instrument Controls | BWP9032 | Inspect, Test and Maintain Control Systems Omni 6000 | BWP |
| PLCs/Instrument Controls | AP 711 | Inspect, Test, and Maintain Control Systems | CCT |
| PLCs/Instrument Controls | SMUD 712 | Remote Terminal Unit (RTU) | CCT |
| Pressure Limiting and Regulating Devices: Installation/Inspection/Maintenance | 714 | Inspect and Maintain Pressure Limiting and Regulating Devices | CCT |
| Pressure Limiting and Regulating Devices: Installation/Inspection/Maintenance | SCE052 | Test Pressure Regulator | SCE |
| Pressure Limiting and Regulating Devices: Installation/Inspection/Maintenance | SCE052OP | Test Pressure Regulator | CCT |
| Pressure Limiting and Regulating Devices: Installation/Inspection/Maintenance | SCE053 | Inspect/Troubleshoot/Repair Pressure Regulator | SCE |
| Pressure Limiting and Regulating Devices: Installation/Inspection/Maintenance | SCE053OP | Inspect/Troubleshoot/Repair Pressure Regulator | CCT |
| Pressure Limiting and Regulating Devices: Installation/Inspection/Maintenance | SCE091 | Test Unit Overpressure Protection Electronic Shutdown Device | SCE |
| Pressure Limiting and Regulating Devices: Installation/Inspection/Maintenance | SCE091OP | Test Unit Overpressure Protection Electronic Shutdown Device | CCT |
| Pressure Limiting and Regulating Devices: Installation/Inspection/Maintenance | 765 | Inspection and Repair of Rupture Pin Devices | CCT |
| Pressure Limiting and Regulating Devices: Installation/Inspection/Maintenance | VM-714OP | Inspect and Maintain Pressure Limiting and Regulating Devices | CCT |
| Pressure Limiting and Regulating Devices: Installation/Inspection/Maintenance | FCG 028A OP | Installing, operating, inspecting and testing pressure limiting devices Regulator Stations | CCT |
| Pressure Limiting and Regulating Devices: Installation/Inspection/Maintenance | FCG 028B OP | Installing, operating, inspecting and testing pressure limiting devices Residential and Commercial | CCT |
| Pressure Limiting and Regulating Devices: Installation/Inspection/Maintenance | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Pressure Limiting and Regulating Devices: Installation/Inspection/Maintenance | FCG 028A | Installing, operating, inspecting and testing pressure limiting devices Regulator Stations | FCG |
| Pressure Limiting and Regulating Devices: Installation/Inspection/Maintenance | FCG 028B | Installing, operating, inspecting and testing pressure limiting devices Residential and Commercial | FCG |
| Pressure Limiting and Regulating Devices: Installation/Inspection/Maintenance | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Pressure Limiting and Regulating Devices: Installation/Inspection/Maintenance | CC-204OP | Inspect, Test, Maintain and Calibrate Pressure Limiting Devices and Relief Valves - Spring | CCT |
| Pressure Limiting and Regulating Devices: Installation/Inspection/Maintenance | HPC-767OP | KPL Junction Inspection and Installation of Rupture Disc | CCT |
| Pressure Limiting and Regulating Devices: Installation/Inspection/Maintenance | HPC-767 | KPL Junction Inspection and Installation of Rupture Disc | HEC |
| Pressure Limiting and Regulating Devices: Installation/Inspection/Maintenance | 671 | Pipeline Heater - Inspection and Preventive Maintenance | CCT |
| Pressure Limiting and Regulating Devices: Installation/Inspection/Maintenance | HPC-023OP | Breather and Conservation Vent | CCT |
| Pressure Switches and Transmitters | 715 | Test and Maintain Pressure Switches and Transmitters in Pressure Limiting and Regulating Service | CCT |
| Pressure Switches and Transmitters | OQ-0221 | Task 0221 Inspect, Test and Maintain Sensing Devices | DOM |
| Pressure Switches and Transmitters | CM 715OP | Test and Maintain Pressure Switches and Transmitters in Pressure Limiting and Regulating Service | CCT |
| Pressure Switches and Transmitters | VM-715OP | Test and Maintain Pressure Switches and Transmitters in Pressure Limiting and Regulating Service | CCT |
| Pressure Switches and Transmitters | CC-206OP | Inspect, Test and Calibrate Switches & Transmitters | CCT |
| Proctored Exam Required | OQ-1700 | Task 1700 Abnormal Operating Conditions | DOM |
| Proctored Exam Required | OQ-1700 | Task 1700 Abnormal Operating Conditions | DOMHOPE |
| Project Monitoring/Inspection | 616 | Atmospheric Monitoring during Hot Work Operations | CCT |
| Project Monitoring/Inspection | 910 | Inspection of Construction Activities | CCT |
| Project Monitoring/Inspection | TC-910 | Inspection of Pipeline Construction Activities | TC |
| Project Monitoring/Inspection | TC-911 | Inspection of Facilities Construction Activities | TC |
| Project Monitoring/Inspection | PAA-56.0 | Perform Incremental Pressure Increases to Uprate MAOP (Gas) | CCT |
| Project Monitoring/Inspection | MW-616i | Atmospheric Monitoring during Hot Work Operations (Inspection) | MWE |
| Project Monitoring/Inspection | VM-910OP | Depth of Cover Verification | CCT |
| Project Monitoring/Inspection | FCG 020A OP | Increase system pressure (uprating) | CCT |
| Project Monitoring/Inspection | FCG 021A OP | Inspection of plastic pipe | CCT |
| Project Monitoring/Inspection | FCG 022AOP | Inspection of steel pipe | CCT |
| Project Monitoring/Inspection | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Project Monitoring/Inspection | FCG 020A | Increase system pressure (uprating) | FCG |
| Project Monitoring/Inspection | FCG 021A | Inspection of plastic pipe | FCG |
| Project Monitoring/Inspection | FCG 022A | Inspection of steel pipe | FCG |
| Project Monitoring/Inspection | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Project Monitoring/Inspection | CC-306OP | Purge Pipeline of Hazardous Liquid | CCT |
| Project Monitoring/Inspection (Welding) | 202 | Monitoring of Welding Process | CCT |
| Project Monitoring/Inspection (Welding) | OQ-0811 | Task 0811 Visual Inspection of Welding and Welds | DOM |
| Project Monitoring/Inspection (Welding) | OQ-0811 | Task 0811 Visual Inspection of Welding and Welds | DOMHOPE |
| Project Monitoring/Inspection (Welding) | SCE059 | Perform Welding Inspection | SCE |
| Project Monitoring/Inspection (Welding) | SCE059OP | Perform Welding Inspection | CCT |
| Project Monitoring/Inspection (Welding) | LBGO 202OP | Monitoring of Welding Process | CCT |
| Project Monitoring/Inspection (Welding) | CM 616OP | Atmospheric Monitoring during Hot Work Operations | CCT |
| Project Monitoring/Inspection (Welding) | LBGO 202 | Monitoring of Welding Process | LBGO |
| Project Monitoring/Inspection (Welding) | MW-202i | Monitoring of Welding Process | MWE |
| Project Monitoring/Inspection (Welding) | VM-616OP | Atmospheric Monitoring during Hot Work Operations | CCT |
| Provide Security for Pipeline Facilities | 001 | Provide Security for Pipeline Facilities | CCT |
| Provide Security for Pipeline Facilities | CM 001OP | Provide Security for Pipeline Facilities | CCT |
| Provide Security for Pipeline Facilities | VM-001OP | Provide Security for Pipeline Facilities | CCT |
| Provide Security for Pipeline Facilities | CC-201OP | Provide Security for Pipeline Facilities | CCT |
| Provide Security for Pipeline Facilities | CC-207OP | Locate and Mark Pipeline (Permanent Markers) | CCT |
| Pumps: Operate/Maintain/Repair | 020 | Pump Stations/Units - Startup, Operation and Shutdown | CCT |
| Pumps: Operate/Maintain/Repair | CC-303OP | Pump Stations/Units Startup, Operation and Shutdown | CCT |
| Pumps: Operate/Maintain/Repair | 022 | Pump - Inspect Maintain and Repair | CCT |
| Purging/Abandonment/Deactivation | 613 | Purge Pipeline Facilities With Gas | CCT |
| Purging/Abandonment/Deactivation | 614 | Purge Pipeline Facilities With Air or Inert Gas | CCT |
| Purging/Abandonment/Deactivation | SCE039 | Blowdown/Purge/Load Pipeline | SCE |
| Purging/Abandonment/Deactivation | SCE039OP | Blowdown/Purge/Load Pipeline | CCT |
| Purging/Abandonment/Deactivation | SCE046 | Abandonment of Facilities | SCE |
| Purging/Abandonment/Deactivation | SCE046OP | Abandonment of Facilities | CCT |
| Purging/Abandonment/Deactivation | OQ-1651 | Task 1651 Purge - Flammable or Inert Gas | DOM |
| Purging/Abandonment/Deactivation | OQ-1651 | Task 1651 Purge - Flammable or Inert Gas | DOMHOPE |
| Purging/Abandonment/Deactivation | 016 | Purging - Hazardous Liquids | CCT |
| Purging/Abandonment/Deactivation | COP 621OP | Remove a Pipeline from Service | CCT |
| Purging/Abandonment/Deactivation | COP 622OP | Cold Cutting the Pipe | CCT |
| Purging/Abandonment/Deactivation | COP 623OP | Cut The Pipe Using a Saw | CCT |
| Purging/Abandonment/Deactivation | COP 624OP | Hot cut the Pipe | CCT |
| Purging/Abandonment/Deactivation | COP 625OP | Cut Out and Replace a Defective Pipe Segment | CCT |
| Purging/Abandonment/Deactivation | TC-622 | Cold Cutting the Pipe (Mechanical) | TC |
| Purging/Abandonment/Deactivation | LBGO 614OP | Purge Pipeline Facilities with Nitrogen | CCT |
| Purging/Abandonment/Deactivation | LBGO 613OP | Purge Pipeline Facilities with Gas | CCT |
| Purging/Abandonment/Deactivation | CM 016OP | Purging - Hazardous Liquids | CCT |
| Purging/Abandonment/Deactivation | CM 616OP | Atmospheric Monitoring during Hot Work Operations | CCT |
| Purging/Abandonment/Deactivation | AP 613 | Purge Pipeline Facilities With Gas | CCT |
| Purging/Abandonment/Deactivation | AP 614 | Purge Pipeline Facilities With Air or Inert Gas | CCT |
| Purging/Abandonment/Deactivation | LBGO 613 | Purge Pipeline Facilities with Gas | LBGO |
| Purging/Abandonment/Deactivation | LBGO 614 | Purge Pipeline Facilities with Nitrogen | LBGO |
| Purging/Abandonment/Deactivation | MW-616i | Atmospheric Monitoring during Hot Work Operations (Inspection) | MWE |
| Purging/Abandonment/Deactivation | VM-016OP | Pipeline Abandonment | CCT |
| Purging/Abandonment/Deactivation | VM-616OP | Atmospheric Monitoring during Hot Work Operations | CCT |
| Purging/Abandonment/Deactivation | FCG 001A OP | Abandonment and deactivation of facilities | CCT |
| Purging/Abandonment/Deactivation | FCG 001B OP | Abandonment and deactivation of facilities (service lines not in use) | CCT |
| Purging/Abandonment/Deactivation | FCG 001C OP | Abandonment and deactivation of facilities (service lines not in use) X-Pander Pipeline Plug | CCT |
| Purging/Abandonment/Deactivation | FCG 046A OP | Purging of pipelines | CCT |
| Purging/Abandonment/Deactivation | FCG 046B OP | Purging of pipelines Propane | CCT |
| Purging/Abandonment/Deactivation | FCG 046C OP | Purging of pipelines Service Riser | CCT |
| Purging/Abandonment/Deactivation | FCG 046D OP | Purging of Pipelines Medium BTU Landfill Gas Pipeline | CCT |
| Purging/Abandonment/Deactivation | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Purging/Abandonment/Deactivation | FCG 001A | Abandonment and deactivation of facilities | FCG |
| Purging/Abandonment/Deactivation | FCG 001B | Abandonment and deactivation of facilities (service lines not in use) | FCG |
| Purging/Abandonment/Deactivation | FCG 001C | Abandonment and deactivation of facilities (service lines not in use) X-Pander Pipeline Plug | FCG |
| Purging/Abandonment/Deactivation | FCG 046A | Purging of pipelines | FCG |
| Purging/Abandonment/Deactivation | FCG 046B | Purging of pipelines Propane | FCG |
| Purging/Abandonment/Deactivation | FCG 046C | Purging of pipelines Service Riser | FCG |
| Purging/Abandonment/Deactivation | FCG 046D | Purging of Pipelines Medium BTU Landfill Gas Pipeline | FCG |
| Purging/Abandonment/Deactivation | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Purging/Abandonment/Deactivation | CC-305OP | Purge Pipeline Facilities With Air or Inert Gas | CCT |
| Purging/Abandonment/Deactivation | CC-306OP | Purge Pipeline of Hazardous Liquid | CCT |
| Purging/Abandonment/Deactivation | 623 | Pipeline Air Movers/Evacuators | CCT |
| Relief Devices: Inspection/Testing | 709 | Inspection and Testing of Relief Devices (Compressor Stations, Meter Stations, Regulating Stations) | CCT |
| Relief Devices: Inspection/Testing | SCE055 | Test Relief Valve | SCE |
| Relief Devices: Inspection/Testing | SCE055OP | Test Relief Valve | CCT |
| Relief Devices: Inspection/Testing | SCE057 | Inspect/Troubleshoot/Repair Relief Valve | SCE |
| Relief Devices: Inspection/Testing | SCE057OP | Inspect/Troubleshoot/Repair Relief Valve | CCT |
| Relief Devices: Inspection/Testing | AP 709 | Inspection of Relief Devices (Compressor Stations, Meter Stations, Regulating Stations) | CCT |
| SCADA/Communication Systems | SCE089 | Maintain/Troubleshoot SCADA System | SCE |
| SCADA/Communication Systems | SCE089OP | Maintain/Troubleshoot SCADA System | CCT |
| SCADA/Communication Systems | FCG 028D OP | SCADA Pressure Control | CCT |
| SCADA/Communication Systems | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| SCADA/Communication Systems | FCG 028D | SCADA Pressure Control | FCG |
| SCADA/Communication Systems | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Service Lines - Operation and Maintenance | OQ-1201 | Task 1201 Temporary Isolation of Service Lines and Service Discontinuance | DOM |
| Service Lines - Operation and Maintenance | OQ-1201 | Task 1201 Temporary Isolation of Service Lines and Service Discontinuance | DOMHOPE |
| Service Lines - Operation and Maintenance | OQ-1191 | Task 1191 Maintenance of Service Valves Upstream of Customer Meter | DOM |
| Service Lines - Operation and Maintenance | OQ-1191 | Task 1191 Maintenance of Service Valves Upstream of Customer Meter | DOMHOPE |
| Service Lines - Operation and Maintenance | 742 | Temporary Isolation of Service Lines and Service Discontinuance | CCT |
| Service Lines - Operation and Maintenance | LBGO 742OP | Temporary Isolation of Service Lines and Service Discontinuance | CCT |
| Steel Pipe: Installation | 905 | Lowering/Installation of Steel Pipe into Ditch | CCT |
| Steel Pipe: Installation | BHE 322 | Installation of Steel Pipe in a Bore | BHE |
| Steel Pipe: Installation | MW-905i | Lowering Pipe into Ditch | MWE |
| Steel Pipe: Installation | VTG- i321 | Installation of Steel Pipe in a Ditch (Inspection Only) | VERG |
| Steel Pipe: Installation | VTG- i322 | Installation of Steel Pipe in a Bore (Inspection Only) | VERG |
| Steel Pipe: Installation | BHP - i321 | Installation of Steel Pipe in a Ditch (Inspection Only) | BHPFPU |
| Steel Pipe: Installation | BHP - i322 | Installation of Steel Pipe in a Bore (Inspection Only) | BHPFPU |
| Steel Pipe: Installation | DCG 321 | Installation of Steel Pipe in a Ditch | DOMCAR |
| Steel Pipe: Installation | DCG 321OP | Installation of Steel Pipe in a Ditch | CCT |
| Steel Pipe: Installation | OKE 321 | Installation of Steel Pipe in a Ditch (G0861) | ONEOK |
| Steel Pipe: Installation | OKE 322 | Installation of Steel Pipe in a Bore (G0871) | ONEOK |
| Steel Pipe: Installation | FCG 026A OP | Installation of steel pipe | CCT |
| Steel Pipe: Installation | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Steel Pipe: Installation | FCG 026A | Installation of steel pipe | FCG |
| Steel Pipe: Installation | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Steel Pipe: Installation (Boring/HDD) | OQ-0871 | Task 0871 Installation of Steel Pipe in a Bore | DOM |
| Steel Pipe: Installation (Boring/HDD) | OQ-0871 | Task 0871 Installation of Steel Pipe in a Bore | DOMHOPE |
| Steel Pipe: Installation (Boring/HDD) | 903 | Directional Drilling and/or Boring | CCT |
| Steel Pipe: Installation (Boring/HDD) | MW-903i | Directional Drilling and/or Boring | MWE |
| Steel Pipe: Installation (Boring/HDD) | OPNSA-i902 | Field Bending of Pipe (Inspection only) | OPNA |
| Steel Pipe: Installation (Boring/HDD) | OPNSA-i902OP | Field Bending of Pipe (Inspection only) | CCT |
| Steel Pipe: Installation (Direct Burial) | OQ-0861 | Task 0861 Installation of Steel Pipe in a Ditch | DOM |
| Steel Pipe: Installation (Direct Burial) | OQ-0861 | Task 0861 Installation of Steel Pipe in a Ditch | DOMHOPE |
| Steel Pipe: Installation (Field Bending) | OQ-0891 | Task 0891 Field Bending of Steel Pipe | DOM |
| Steel Pipe: Installation (Field Bending) | OQ-0891 | Task 0891 Field Bending of Steel Pipe | DOMHOPE |
| Steel Pipe: Installation (Field Bending) | 902 | Field Bending of Pipe | CCT |
| Steel Pipe: Installation (Field Bending) | CHK-902i | Field Bending of Pipe (Inspection only) | CEC |
| Steel Pipe: Installation (Field Bending) | MW-902i | Field Bending of Pipe (Inspection only) | MWE |
| Steel Pipe: Mechanical Joining | 213 | Joining of Metal Pipe and Components by means other than Welding - Threaded and Flanged Connections | CCT |
| Steel Pipe: Mechanical Joining | 214 | Joining of Metal Pipe and Components by means other than Welding - Threaded Connections | CCT |
| Steel Pipe: Mechanical Joining | 215 | Joining of Metal Pipe and Components by means other than Welding- Flanged Connections | CCT |
| Steel Pipe: Mechanical Joining | 216 | Joining of Metal Pipe - Compression Couplings | CCT |
| Steel Pipe: Mechanical Joining | 217 | Small Diameter Metal Tubing and Fitting Installation | CCT |
| Steel Pipe: Mechanical Joining | OQ-0731 | Task 0731 Joining of Pipe - Flange Assembly | DOM |
| Steel Pipe: Mechanical Joining | OQ-0731 | Task 0731 Joining of Pipe - Flange Assembly | DOMHOPE |
| Steel Pipe: Mechanical Joining | OQ-0721 | Task 0721 Joining of Pipe - Threaded Joints | DOM |
| Steel Pipe: Mechanical Joining | OQ-0721 | Task 0721 Joining of Pipe - Threaded Joints | DOMHOPE |
| Steel Pipe: Mechanical Joining | SCE044 | Joining Other Than Welding | SCE |
| Steel Pipe: Mechanical Joining | SCE044OP | Joining Other Than Welding | CCT |
| Steel Pipe: Mechanical Joining | TC-214-I | Joining of Steel Pipe - Threaded Connections (Inspection only) | TC |
| Steel Pipe: Mechanical Joining | TC-215-I | Joining of Steel Pipe - Flanged Connections (Inspection Only) | TC |
| Steel Pipe: Mechanical Joining | TC-217-I | Small Diameter Metal Tubing and Fitting Installation (Inspection Only) | TC |
| Steel Pipe: Mechanical Joining | OQ-0821 | Task 0821 Tubing & Fitting Installation - Instrument, Control, & Sampling | DOM |
| Steel Pipe: Mechanical Joining | OQ-0821 | Task 0821 Tubing & Fitting Installation - Instrument, Control, & Sampling | DOMHOPE |
| Steel Pipe: Mechanical Joining | CHK-213i | Joining of Steel Pipe - Threaded and Flanged Connections (Inspection only) | CEC |
| Steel Pipe: Mechanical Joining | MW-213i | Joining of Steel Pipe - Threaded and Flanged Connections (Inspection only) | MWE |
| Steel Pipe: Mechanical Joining | OPNSA-i213 | Joining of Metal Pipe and Components by means other than Welding - Threaded and Flanged Connections (Inspection only) | OPNA |
| Steel Pipe: Mechanical Joining | OPNSA-i213OP | Joining of Metal Pipe and Components by means other than Welding - Threaded and Flanged Connections (Inspection only) | CCT |
| Steel Pipe: Mechanical Joining | BWP9025 | Joining of Metal Pipe - Compression Couplings | BWP |
| Steel Pipe: Mechanical Joining | 9025 | Joining of Metal Pipe - Compression Couplings | CCT |
| Steel Pipe: Mechanical Joining | BHP - i213 | Joining of Metal Pipe and Components by Means other than Welding - Threaded and Flanged Connections (Inspection only) | BHPFPU |
| Steel Pipe: Mechanical Joining | BHP - i217 | Small Diameter Metal Tubing and Fitting Installation (Inspection only) | BHPFPU |
| Steel Pipe: Mechanical Joining | LBGO 213OP | Joining of Metal Pipe and Components by means other than Welding - Threaded and Flanged Connections | CCT |
| Steel Pipe: Mechanical Joining | LBGO 215OP | Joining of Metal Pipe and Components by means other than Welding- Flanged Connections | CCT |
| Steel Pipe: Mechanical Joining | LBGO 217OP | Small Diameter Metal Tubing and Fitting Installation | CCT |
| Steel Pipe: Mechanical Joining | LBGO 214OP | Joining of Metal Pipe and Components by means other than Welding - Threaded Connections | CCT |
| Steel Pipe: Mechanical Joining | CM 213OP | Joining of Metal Pipe and Components by means other than Welding -Threaded and Flanged Connections | CCT |
| Steel Pipe: Mechanical Joining | LBGO 213 | Joining of Metal Pipe and Components by means other than Welding - Threaded and Flanged Connections | LBGO |
| Steel Pipe: Mechanical Joining | LBGO 214 | Joining of Metal Pipe and Components by means other than Welding - Threaded Connections | LBGO |
| Steel Pipe: Mechanical Joining | LBGO 215 | Joining of Metal Pipe and Components by means other than Welding- Flanged Connections | LBGO |
| Steel Pipe: Mechanical Joining | LBGO 217 | Small Diameter Metal Tubing and Fitting Installation | LBGO |
| Steel Pipe: Mechanical Joining | VM-215OP | Joining of Metal Pipe and Components by means other than Welding - Flanged Connections | CCT |
| Steel Pipe: Mechanical Joining | VM-217OP | Small Diameter Metal Tubing and Fitting Installation | CCT |
| Steel Pipe: Mechanical Joining | FCG 030A OP | Joining plastic and Steel Pipe by Mechanical Means | CCT |
| Steel Pipe: Mechanical Joining | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Steel Pipe: Mechanical Joining | FCG 030A | Joining plastic and Steel Pipe by Mechanical Means | FCG |
| Steel Pipe: Mechanical Joining | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Steel Pipe: Mechanical Joining | FCG JQ-MECH-SADDLE-04 | Mechanical Joining Mechanical Saddle 4 in | FCG |
| Steel Pipe: Mechanical Joining | FCG JQ-MECH-SADDLE-08 | Mechanical Joining Mechanical Saddle 8 in | FCG |
| Steel Pipe: Mechanical Joining | FCG JQ-MECH-SADDLE-04 OP | Mechanical Joining Mechanical Saddle 4 in | CCT |
| Steel Pipe: Mechanical Joining | FCG JQ-MECH-SADDLE-08 OP | Mechanical Joining Mechanical Saddle 8 in | CCT |
| Steel Pipe: Mechanical Joining | CC-809OP | Threaded and Flanged Connections | CCT |
| Steel Pipe: Mechanical Joining | CC-811OP | Flanged Connections | CCT |
| Steel Pipe: Mechanical Joining | CC-812OP | Tubing & Fitting Installation - Instrument, Control and Sampling | CCT |
| Steel Pipe: Mechanical Joining | CC-810OP | Threaded Connections | CCT |
| Steel Pipe: Mechanical Joining | FCG-JQ-MECH-SADDLE-02 & Below OP | Mechanical Joining Mechanical Saddle 2 in & Below | CCT |
| Steel Pipe: Mechanical Joining | FCG-JQ-MECH-SADDLE-02 & Below | Mechanical Joining Mechanical Saddle 2 in & Below | FCG |
| Steel Pipe: Mechanical Joining | PAA-40.2 | Joining of Pipe- Other Than Weld | CCT |
| Steel Pipe: Mechanical Joining | DCP 213 | Joining & Disassembly - Threaded and Flanged Connections | DCP |
| Steel Pipe: Mechanical Joining | DCP 213OP | Joining & Disassembly - Threaded and Flanged Connections | CCT |
| Steel Pipe: Squeeze-Off | OQ-1151 | Task 1151 Squeeze off Steel Pipe | DOM |
| Steel Pipe: Squeeze-Off | OQ-1151 | Task 1151 Squeeze off Steel Pipe | DOMHOPE |
| Steel Pipe: Squeeze-Off | FCG 001SUBA OP | Pipeline Shutdown, Plastic and Steel Pipe by Use of Squeezers | CCT |
| Steel Pipe: Squeeze-Off | FCG 001SUBA | Pipeline Shutdown, Plastic and Steel Pipe by Use of Squeezers | FCG |
| Stopping / Bagging - Low Pressure | OQ-1121 | Task 1121 Bagging and Stopping Low Pressure Pipe | DOM |
| Stopping / Bagging - Low Pressure | OQ-1121 | Task 1121 Bagging and Stopping Low Pressure Pipe | DOMHOPE |
| Stopping / Bagging - Low Pressure | 761 | Bagging and Stopping of Low Pressure Pipe | CCT |
| Stopping / Bagging - Low Pressure | 040 | Isolation of Pipe with Mud Plug | CCT |
| Stopping / Bagging - Low Pressure | 766 | Isolation of Pipe with Inflatable Plug | CCT |
| Stopping / Bagging - Low Pressure | HPC-768OP | Pipeline Plug Installation and Removal | CCT |
| Stopping / Bagging - Low Pressure | HPC-768 | Pipeline Plug Installation and Removal | HEC |
| Support Structures: Installation, Replacement, and Repair | FCG 027A OP | Installation of support and anchors | CCT |
| Support Structures: Installation, Replacement, and Repair | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Support Structures: Installation, Replacement, and Repair | FCG 027A | Installation of support and anchors | FCG |
| Support Structures: Installation, Replacement, and Repair | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Valves: Installation, Maintenance, and Operation | 007 | Operate Valves | CCT |
| Valves: Installation, Maintenance, and Operation | 716 | Inspect, Maintain, and Operate Valves | CCT |
| Valves: Installation, Maintenance, and Operation | OQ-0301 | Task 0301 Manually Opening and Closing Valves | DOM |
| Valves: Installation, Maintenance, and Operation | OQ-0301 | Task 0301 Manually Opening and Closing Valves | DOMHOPE |
| Valves: Installation, Maintenance, and Operation | SCE028 | Inspect/Operate/Maintain Valves, Valve Actuators, and Operators | SCE |
| Valves: Installation, Maintenance, and Operation | SCE028OP | Inspect/Operate/Maintain Valves, Valve Actuators, and Operators | CCT |
| Valves: Installation, Maintenance, and Operation | SCE048 | Troubleshoot/Repair Valves - Major | SCE |
| Valves: Installation, Maintenance, and Operation | SCE048OP | Troubleshoot/Repair Valves - Major | CCT |
| Valves: Installation, Maintenance, and Operation | SCE054 | Test Control Valve | SCE |
| Valves: Installation, Maintenance, and Operation | SCE054OP | Test Control Valve | CCT |
| Valves: Installation, Maintenance, and Operation | SCE056 | Inspect/Troubleshoot/Repair Control Valve, Controllers, and Positioners | SCE |
| Valves: Installation, Maintenance, and Operation | SCE056OP | Inspect/Troubleshoot/Repair Control Valve, Controllers, and Positioners | CCT |
| Valves: Installation, Maintenance, and Operation | SCE094 | Operate Key Valves to Manage Flow & MaintainDOT Compliance | SCE |
| Valves: Installation, Maintenance, and Operation | SCE094OP | Operate Key Valves to Manage Flow & MaintainDOT Compliance | CCT |
| Valves: Installation, Maintenance, and Operation | LBGO 007OP | Operate Valves Flathead and Ball Valve Only | CCT |
| Valves: Installation, Maintenance, and Operation | LBGO 716OP | Inspect, Maintain, and Operate Valves | CCT |
| Valves: Installation, Maintenance, and Operation | CM 716OP | Inspect, Maintain, and Operate Valves | CCT |
| Valves: Installation, Maintenance, and Operation | 736 | Valve (Pneumatic) Actuator/Operator Inspection, Testing and Maintenance | CCT |
| Valves: Installation, Maintenance, and Operation | 737 | Valve (Hydraulic) Actuator/Operator Inspection, Testing and Maintenance | CCT |
| Valves: Installation, Maintenance, and Operation | 738 | Valve (Electric) Actuator/Operator Inspection, Testing and Maintenance | CCT |
| Valves: Installation, Maintenance, and Operation | 383 | Excess Flow Valves (EFV) (Installation) | CCT |
| Valves: Installation, Maintenance, and Operation | LBGO 007 | Operate Valves Flathead and Ball Valve Only | LBGO |
| Valves: Installation, Maintenance, and Operation | BHPB 716 | Inspect, Maintain, and Operate Valves, Manual, Pneumatic Actuated & Hydraulic Actuated | BHP |
| Valves: Installation, Maintenance, and Operation | BHPB 716OP | Inspect, Maintain, and Operate Valves, Manual, Pneumatic Actuated & Hydraulic Actuated | CCT |
| Valves: Installation, Maintenance, and Operation | MW-007i | Operate Valves (Inspection) | MWE |
| Valves: Installation, Maintenance, and Operation | VM-007OP | Operate Valves | CCT |
| Valves: Installation, Maintenance, and Operation | VM-716OP | Inspect, Maintain, and Operate Valves | CCT |
| Valves: Installation, Maintenance, and Operation | VM-738OP | Valve (Electric) Actuator/Operator Inspection, Testing and Maintenance | CCT |
| Valves: Installation, Maintenance, and Operation | FCG 018A OP | EFV installation | CCT |
| Valves: Installation, Maintenance, and Operation | FCG 052A OP | Valve Inspection | CCT |
| Valves: Installation, Maintenance, and Operation | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Valves: Installation, Maintenance, and Operation | FCG 018A | EFV installation | FCG |
| Valves: Installation, Maintenance, and Operation | FCG 052A | Valve Inspection | FCG |
| Valves: Installation, Maintenance, and Operation | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Valves: Installation, Maintenance, and Operation | CC-202OP | Inspect, Maintain, and Operate Valves | CCT |
| Valves: Installation, Maintenance, and Operation | CC-203OP | Valve (Electric) Actuator / Operator Inspection, Testing and Maintenance | CCT |
| Valves: Installation, Maintenance, and Operation | CC-301OP | Manually Operate Valves | CCT |
| Valves: Installation, Maintenance, and Operation | 736ENB | Valve (Pneumatic) Actuator/Operator Inspection, Testing and Maintenance (Does Not Include Calibration) | CCT |
| Valves: Installation, Maintenance, and Operation | 737ENB | Valve (Hydraulic) Actuator/Operator Inspection, Testing and Maintenance (Does Not Include Calibration) | CCT |
| Valves: Installation, Maintenance, and Operation | 738ENB | Valve (Electric) Actuator/Operator Inspection, Testing and Maintenance (Does Not Include Calibration) | CCT |
| Valves: Installation, Maintenance, and Operation | AP 737 | Valve (Hydraulic) Actuator/Operator Inspection, Testing and Maintenance | CCT |
| Valves: Installation, Maintenance, and Operation | 800 | Operate Valves (Remote Operate not SCADA) | CCT |
| Vaults | 717 | Maintaining Vaults With Pressure Regulating and Pressure Limiting Equipment | CCT |
| Vaults | SCE040 | Inspect/Maintain Vaults | SCE |
| Vaults | SCE040OP | Inspect/Maintain Vaults | CCT |
| Vaults | FCG 053A OP | Vault inspection and maintenance | CCT |
| Vaults | FCG 055A OP | Visual inspection of joining materials others than welding Heat Fusion | CCT |
| Vaults | FCG 055B OP | Visual inspection of joining materials others than welding Electrofusion | CCT |
| Vaults | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Vaults | FCG 053A | Vault inspection and maintenance | FCG |
| Vaults | FCG 055A | Visual inspection of joining materials others than welding Heat Fusion | FCG |
| Vaults | FCG 055B | Visual inspection of joining materials others than welding Electrofusion | FCG |
| Vaults | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Visual Inspection of a Weld | 203 | Visual Inspection of Welds not Non-Destructively Tested | CCT |
| Visual Inspection of a Weld | SCE080 | Perform Advance Visual Testing | SCE |
| Visual Inspection of a Weld | SCE080OP | Perform Advance Visual Testing | CCT |
| Visual Inspection of a Weld | LBGO 203OP | Visual Inspection of Welds | CCT |
| Visual Inspection of a Weld | LBGO 203 | Visual Inspection of Welds not Non-Destructively Tested | LBGO |
| Visual Inspection of a Weld | MW-203i | Visual Inspection of Welds not Non-Destructively Tested | MWE |
| Visual Inspection of a Weld | CC-603OP | Visually Inspect of Welds | CCT |
| Welding | 201 | Abnormal Operating Conditions Related to Welding on Pipelines | CCT |
| Welding | OQ-0801 | Task 0801 Welding - Shielded Metal Arc | DOM |
| Welding | OQ-0801 | Task 0801 Welding - Shielded Metal Arc | DOMHOPE |
| Welding | OQ-0802 | Task 0802 Welding - Low Hydrogen | DOM |
| Welding | OQ-0802 | Task 0802 Welding - Low Hydrogen | DOMHOPE |
| Welding | OQ-0803 | Task 0803 Welding - Gas Metal Arc | DOM |
| Welding | OQ-0803 | Task 0803 Welding - Gas Metal Arc | DOMHOPE |
| Welding | SCE060 | Perform Pipeline/Plant Welding | SCE |
| Welding | SCE060OP | Perform Pipeline/Plant Welding | CCT |
| Welding | SCE061 | Perform Welding on Loaded Lines | SCE |
| Welding | SCE061OP | Perform Welding on Loaded Lines | CCT |
| Welding | SCE062 | Perform Specialized Welding | SCE |
| Welding | SCE062OP | Perform Specialized Welding | CCT |
| Welding | SCE064 | Perform Basic Beveling Operations | SCE |
| Welding | SCE064OP | Perform Basic Beveling Operations | CCT |
| Welding | SPL 4201 | Abnormal Operating Conditions Related to Welding on Pipelines (Maintenance, Tie-Ins, and Repair) | SIN |
| Welding | KRGT-0006 | Spot Welding | KRGT |
| Welding | 222 | Joining of Pipe - Brazing or Soldering | CCT |
| Welding | FCG 056A OP | Welding | CCT |
| Welding | FCG 059A OP | Generic Abnormal Operating Conditions | CCT |
| Welding | FCG 056A | Welding | FCG |
| Welding | FCG 059A | Generic Abnormal Operating Conditions | FCG |
| Welding | EMP-30 | Welder Qualification Test | CCT |